KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  9-29-2010
Number of Hours:  2.50
Manual Reference:  8s8-1r1 12/2/08
Brief Description:  Drilling fuselage skins

Page 8-26

Right side

Match drilled #30 the 1/8 holes common to the fwd side skin and F-887 upper longerons
Match drilled #30 the 1/8 holes in the F-801C upper angle common to the upper longeron
Match Drilled #40 the 3/32 holes in the Fwd side skins common to the upper longeron
Final drilled #19 the fwd side skins for the structural screws near the botton of the LG box assemblies
' style=

Drilling lower longeron

Drilling lower longeron

' style=




' style=

Drilling the longerons in the fwd skins complete

Drilling the longerons in the fwd skins complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.