Page 8-11 Clecoed the 814E L-1 and R-1 Seat Ramp supports and the F804J L-1 and R-1 Aft floor Supports angles to the 802B-2 Center Section Final drilled #30 all of the 1/8 holes between parts Final drilled 1/4 inch the F-804G-1 Vertical Bar holes Machine countersunk the hole for the rivet that lies under the vertical bars Match drilled #12 the top and bottom bolt holes in the F-814E-L-1 and R-1 seat ramp support Final drilled #40 all of the nutplate holes deburred and primed the parts Riveted nutplates to the F-814E-L-1 and R-1 Seat ramp supports as well as the F-804J-L-1 and R-1 floor support angles Clecoed the assembly together for riveting
Match drilling the bulkheads
Drilling the #12 bolt holes in the F-814E L & R Seat Ramp Supports