KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  7-10-2010
Number of Hours:  0.50
Manual Reference:  8s8-1r1 12/2/2008
Brief Description:  L.G. Box assemblies

Page 8-6
Riveted the LG Box assemblies to the fwd floor assembly through the 802H-L-1 L & R aft corner angles
Clecoed the upper brace Aft and Fwd
Final drilled #30 all 1/8 holes in the aft and fwd upper braces
Final drilled #12 all 3/16 holes in the aft and fwd upper braces
' style=

Riveting the L.G. Box assemblies to the sub-floor

Riveting the L.G. Box assemblies to the sub-floor

' style=

Drilling the fwd and aft upper braces

Drilling the fwd and aft upper braces

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.