KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  1-26-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Rolled and Riveted Left Rudder leading edge

Rolled the leading edge. This was tough. The edge tapers from wide at the bottom to tight near the top. This necessitated doing the rolling in several stages. Once the bottom was rolled it got in the way of the top when it was rolled.
' style=

Applying duct tape to the edge

Applying duct tape to the edge

' style=

Cleco's in

Cleco's in

' style=

All Done

All Done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.