Brief Description: Drilling the horizontal stabilizer
Slipped the HS404 and 405 ribs into place and marked the hole locations. Took them out and marked the centerline of the flanges so that I can make sure that they are centered before drilling. Then I fluted them and re-installed them into the assembly this time with clamps. Then I started match drilling the skin.