Brief Description: Drilling the Vertical Stabilizer
Prepped the 808 spar doubler and the 803 rear spar clecoed them together end clecoed the 410 411 and 412 hinge brackets Drilled the 410 hinge bracket. Prepared VS-704 VS-705 VS-706 and VS-707 ribs The drawing Vans sent me is incorrect. The drawing in the instructions is correct. I will call Vans on Monday and have the correct drawing sent. Clecoed the ribs to front and rear spars and drilled to # 30 VS-808 VS 410 VS-411 and VS412 to VS-803 Drilled all rib to spar attach holes