KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  7-12-2010
Number of Hours:  3.00
Manual Reference:  8s8-1r1 12/2/08
Brief Description:  Forward Fuselage Sub-Structure

Page 8-6
Separated the 870B, 870E 870D and 870E stiffeners, trimmed the stiffeners as required and deburred the edges
Clecoed the stiffeners to the baggage floor and final drilled #40 all the 3/32 holes in common
Final drilled all of the 3/32 nutplate attachment holes

Page 8-7
Clecoed the 866 mounting plate to the upper fwd baggage bulkhead and final drilled #30 the holes in common
Deburred all of the screw holes and final drilled holes
Machine countersunk the forward side of the F-866 mounting plate
Dimple countersunk all of the nutplate attach holes in the F866 lower bulkhead
Dimple countersunk all of the #40 holes the Baggage floor parts
Primed all of the parts
Back riveted the stiffeners to the baggage floor
Riveted the mounting plate to the aft side of the lower bulkhead
Clecoed the assembly together
Clecoed and drilled the firewall to the assembly and deburred the final drilled holes
' style=

Backriveting stiffeners

Backriveting stiffeners

' style=

Firewall clecoed on

Firewall clecoed on

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.