KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  7-8-2010
Number of Hours:  2.00
Manual Reference:  8s8-1r1 12/2/08
Brief Description:  Landing Gear Box Assembly

page 8-5
Temporarily bolted the 813-1 L.G. Weldments to the L.G. Box Assemblies
Match drilled the bolt holes in the weldments
removed, deburred and reinstalled the weldments with all bolts and torqued bolts to 25 inch lbs
Installed the bolts in the fwd and aft corner angles and torqued bolts to 25 inch lbs
deburred the mid-cabin braces and marked the holes not to be riveted on the LG box assemblies
Clecoed the L.G. Box assemblies to the sub-floor assembly
' style=

Bucking nutplate rivets for throttle quadrant Bracket

Bucking nutplate rivets for throttle quadrant Bracket

' style=

Match drilling the holes in the weldment

Match drilling the holes in the weldment

' style=

L.G Box assemblies clecoed to subfloor

L.G Box assemblies clecoed to subfloor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.