KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  6-27-2010
Number of Hours:  3.00
Manual Reference:  8s8-1r1 12/2/08
Brief Description:  Cooling Ramp Assembly

Page 8-4
Trimmed the flanges on the F867A-1 cooling air ramp
Cleco'ed and final drilled all of the parts
Dimpled the cooling air ramp and stiffeners
Deburred and primed all of the parts
Back riveted the F867D-1 to the cooling air ramp
Riveted the 867C-1 attach angle to the F802U-1
' style=

Riveting the intercostal ribs

Riveting the intercostal ribs

' style=

Deburring the parts for the Cooling ramp

Deburring the parts for the Cooling ramp

' style=

Back riveting F867D-1

Back riveting F867D-1

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.