KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  6-30-2010
Number of Hours:  0.50
Manual Reference:  8s8-1r1 12/2/2008
Brief Description:  Landing Gear box assembly

Page 8-4
Received the back ordered Bolt Weldments from Vans.
Cleco'ed together all of the parts on DWG 62 for Left and RightLG Box assemblies
Matched drilled all of the #30 holes and final drilled the 3/16 holes specified to #12
' style=

Final Drilling the #12 holes

Final Drilling the #12 holes

' style=

Match drilling the #30

Match drilling the #30

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.