KitLog pro

Powered By Kitlog Pro v2.0

JIM'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-17-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Final touches to rudder and elevator

One side of the upper and lower rudder fairings were installed. The other half is done during final assembly. The micro vortex generators were installed on the bottom leading edge of the elevator. These lil dudes remain covered until the elevator is at max up deflection and aid in keeping air from seperating from the elevator during slow flight. Pretty cool option. I have finally finished the tasks for empennage assembly and have moved on to the main wings. I begain the assembly of select aft main wing ribs to the flaperon brackets.
' style=





' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.