Brief Description: Completed Installation of Main Wheel Fairings
Match drilled the wheel pants in three places each per the plans then removed them (after about a week for the epoxy to set up in the cold temperatures) Installed the nutplates, tapped them, countersunk the front halves. Took some time as I needed to use a temporary nutplate to match drill each all the various nutplate locations. Looks great. Might still sand the edges on the front left fairing half to get a tighter fit.
Using a nutplate to match drill #40 holes to the fairing