Brief Description: Finished the plumbing on 2nd wing
Finished all the plumbing and re-installed the two tanks. Also had to replace several bolts on moving control arms that needed to have castle nuts instead of lock nuts. Installed the site guage rough plumbing in order to test out the workings when I temporarily hang the wings soon.