Date:  7-25-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuselage - Checking Square part 2 for the day

Before I called it a day today I clamped the firewall in it's posiiton and the three rear top bulkheads too so I could again put a square and lazer to the full fuse (so far) to check for racking and square. It alls lines up as it should so - satisfied - I took those items off and put them back in storage until I come to that part of the assembly. Guess I'm getting a bit excessive about square...but better safe than sorry. I now need to get it off the bench and onto bars and saw-bucks so I can make the upper front longeron and some other parts to continue from this point. This will enable me to set the proper angles for the firewall etc as well.
' style=

Firewall is clamped - only - in position to check relation to other parts and plans measurements.

Firewall is clamped - only - in position to check relation to other parts and plans measurements.

' style=

Rear top bulkheads are positioned and clamped - only - to check square again

Rear top bulkheads are positioned and clamped - only - to check square again