KitLog pro

Powered By Kitlog Pro v2.0

Bens RV-10 Site (Non-Active)
' style=
Date:  12-28-2011
Number of Hours:  5.50
Manual Reference:  Ch 9
Brief Description:  Finished the major drilling on the elevator

I was finally able to get back in the garage after a busy few days over Christmas. Today, I finished the primary drilling on the elevator components, disassembled them, and began the tedious task of deburring and dimpling all those little holes.

I'm probably a little more than halfway done with the deburring and dimpling (not including the skins).

With some of my Christmas money/gift cards, i purchased a band saw at Home Depot. I found the rack at Target. I'm probably going to add a piece of plywood on the top shelf (though, the saw is quite stable as it is).

PS: Notice the awesome calendar I have hanging to the right of the saw. My awesome wife bought that for me!
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.