KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  3-10-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed NG2 Foot

Prepaired strut for NG2 Installation. Drilled NG2 and bolted it in place into a BED of FLOX. I used SS Bolts and washers. Also, Ensured that the Nose gear could swivle 360 degrees.
' style=

NG2 Installed

NG2 Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.