Completed fitting Hyd Tubs and installing Hyd PSI switches. All attachments are Loose fitted not torqued yet. I will not complete the torquing until after I build the Strakes in case I have to re-bend or replace a tube extending out the end of the Spar; However, the Layout of the Tubes are finished and look good. will still need to secure the Hyd Switching for G loading.