KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  12-27-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed Grounding Black and Power Block

I installed a Power terminal and Grounding Block on the forward side of the nose petition. I then installed the Main Landing gear controller.
' style=

Terminal Blocks Installed

Terminal Blocks Installed

' style=

MLG Controller Mounted in Place

MLG Controller Mounted in Place

' style=

Hyd Lines Installed

Hyd Lines Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.