KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  1-12-2014
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Left Strake Baffles and Bulkheads

I installed all the Hydralic lines and bulkhead fittings for the Left Strake. I then Installed the Bulkheads and baffles. Once that cured I installed the Cross baffel.
' style=

Hyd Lines installed

Hyd Lines installed

' style=

Bulkeads and Baffles

Bulkeads and Baffles

' style=

Cross Baffel Installed

Cross Baffel Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.