KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  6-19-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  MLG Tub inside layup

I layed up 1 ply of Bid on the inside lip of the strake to tub joint. I then filled the routed out foam with FLOX and pushed the MLG door in place to cure. I used duct tape on door to ensure the door will release after cure. This should make a really nice seam between the door and the tub.
' style=

MLG Door in place

MLG Door in place

' style=

MLG Door in place

MLG Door in place

' style=

Prepaired and ready to start

Prepaired and ready to start

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.