KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  6-9-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fitting MLG Door

Sanded and Fitted the MLG door and tub preparing it for Layup and closeout. I will close out the door with 2 ply BID and once it is cured I will use Micro to get a nice 45 degree angle on the door. Once that is cured I will FLOX all the way around the MLG tub seam and press the MLG door in place while that cures. I should be able to pop the door off after the FLOX cures and have a really nice seam.
' style=

MLG Door in place

MLG Door in place

' style=

Gear Door Ready for closeout

Gear Door Ready for closeout

' style=

MLG Tub ready for inside layup

MLG Tub ready for inside layup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.