KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  2-24-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Embedded the Pitot Conduit into Right Rudder

I removed foam to embed the Pitot Tubes and electrical Conduit into the rudder. I used Nails to hold the tubes and Conduit in place and pored Micro into trench and over tubes and conduit. Once this cures I will use Dry Micro to completely cover the tubes and conduit and prepare the area for the rear spar layup and installation of the Hinge.... Almost forgot to make room for the Rudder return spring tube but the Micro wasn't dry yet and I was able to move the tubes and conduit over enough to make room for the rudder return spring tube.
' style=

Foam removed to accomodate Conduit

Foam removed to accomodate Conduit

' style=

COnduit and tubes Micro'ed in Place

COnduit and tubes Micro'ed in Place

' style=

Tubes and Wires protruding out the top of the rudder

Tubes and Wires protruding out the top of the rudder

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.