Brief Description: Completed Inside Layup of Left WInglet
After letting the 1st Inside 8 Plys of BID in the High stress area cure for 4 hrs I then laid up the additional 8 plys of BID after floxing all corners. I then Installed the Foam block to hold everything in place and taped it down.
1st Inside 8 Plys of BID installed
2nd inside 8 plys of BID installed with FLOX cornes