KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  12-18-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Installed Hydraulic pump bracing, Relays and Paint

Faricated Hadraulic pump braces and glassed them in Place. Also, Installed Click Bond studs to mount the Hyd Pump relays. Cleaned eb=verything up and painted the inside of the nose. Then re-installed the Brakes, Hyd Pump and Relays
' style=

Hyd Pump and Relays Installed

Hyd Pump and Relays Installed

' style=

Hyd Pump Bracing

Hyd Pump Bracing

' style=

Brakes Re-Installed

Brakes Re-Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.