KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  3-20-2010
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Completed the Rear Canopy Fire Wall Rollover struc

This required Preperation inside the Bow followed by 2 seperate Layups. Contorued the inside Foam and replaced some Foam Areas... Skinned the inside of the Bow with 2 plys of BID and applied Peel Ply. Once this was cured I rounter a 3/4" deep groove between the top and inside skin and prepaired the groove for FLOX and Roving. Then potted the Groove with FLOX and placed 1 Ply of BID into Groove followed by ROVING see Picture #2. Once roving was installed, Additional FLOX was placed over the Roving and the 1 Ply of BID was lapped back over the Face of the roving onto the top of the roll over structure. The final sep was to Apply Peel Ply.
' style=

Inside Layup Complete and Groove Ready for  Roving Layup

Inside Layup Complete and Groove Ready for Roving Layup

' style=

Grove FLOXED, 1 Ply BID installed and Roving placed in Groove

Grove FLOXED, 1 Ply BID installed and Roving placed in Groove

' style=

Roll Over complete and Peel Plyed

Roll Over complete and Peel Plyed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.