Brief Description: Completed the Rear Canopy Fire Wall Rollover struc
This required Preperation inside the Bow followed by 2 seperate Layups. Contorued the inside Foam and replaced some Foam Areas... Skinned the inside of the Bow with 2 plys of BID and applied Peel Ply. Once this was cured I rounter a 3/4" deep groove between the top and inside skin and prepaired the groove for FLOX and Roving. Then potted the Groove with FLOX and placed 1 Ply of BID into Groove followed by ROVING see Picture #2. Once roving was installed, Additional FLOX was placed over the Roving and the 1 Ply of BID was lapped back over the Face of the roving onto the top of the roll over structure. The final sep was to Apply Peel Ply.
Inside Layup Complete and Groove Ready for Roving Layup
Grove FLOXED, 1 Ply BID installed and Roving placed in Groove