KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  2-28-2010
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Installing Front Canopy Hinge

I used Bondo to affix the roll over structure temporaraly to the canopy then leveled the canopy and the hinge. I drilled 3 holes into the Canopy side of the hinge and monted the canopy side of the hinge into a bed of flox using 3 AN4 bolts as anchors. for the rollover side I used Phanolic laminate affixed to the Rollover structure with 2 plys of BID at 45 degrees and also used Flox in the corners... Applied Peel Ply all around
' style=

Leveling Canopy to Install Hinge

Leveling Canopy to Install Hinge

' style=

Hinge Installed on Canopy and Roll Over Structure

Hinge Installed on Canopy and Roll Over Structure

' style=

Hinge Installed and Drying

Hinge Installed and Drying

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.