KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  7-4-2012
Number of Hours:  38.00
Manual Reference:  
Brief Description:  Finished up engine installation

This entry is cumulative from 7/1. We completed the engine installation. All of the probes and sensors have been double checked. The fuel flow was verified through the fuel servo. All that remains is to drain the preservative and fill with oil and silcone the small openings in the baffles.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.