Aviation Partners, LLC Project
' style=
Date:  6-30-2012
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Continued with Engine Installation

We have all of the sensors, throttle mixture and prop cables, oil lines and fuel lines installed. In addition, we have installed the exhaust system and requisite heat muffs and scat tubing. The headers will have to be removed to drain the oil preservative prior to engine start, so temporary bolts were used for the exhaust to cylinder attachment. We are still missing a few clamps for the scat tubing. We installed the Garmin EFIS and verified that all sensors were working correctly. We still have to drill the headers and install the EGT probes.