Brief Description: End ribs of the right tank part 1
I set the end ribs in sealnat and clecod them in. I connected the capicitive by soldering it ot the BNC connector and verifiying electrical isolation. I blind riveted the flop tube bracket in place. Tomorrow I will final rivet the ribs, torque down the fuel return and vent lines.
On the left tank I was able to use a clamp to pry open the ends of the skin to get the rib in easier. This time I had Lisa help me by prying them open to slide in the rib.
While I had the sealant out I also put the fuel drain port on the left tank(I leave this to the last so I can lay the work flat for rivetting)