Brief Description: Finish riveting of the inner ribs for the left tan
I'm headed out on vacation tomorrow(hopefully filled with flying in the South West). I needed to get the last ~25 rivets done before I could leave the part as the sealant would be too set in a week.
The general method I have been using so far is discussed a few posts back. Once the rivets are driven I used the extra sealant to cap each shop head inside the tanks. I had enough to do 90%, the rest will get capped with the end rib install
1st pull the cleco and fill the hole with a bit of proseal
next set the rivet in. I used tweezers to pick them up and nest them