KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
' style=
Date:  1-30-2014
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Prepped fuel tank for S/B 13-12-19, Asssembled tow

Fitted fuel tank internal doublers.
Drilled out old rivets.
Cleaned PRC from inside of fuel tank
Checked fuel level transmitter.
Assembled tow bar
' style=

Tank with doublers clecoed in place

Tank with doublers clecoed in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.