KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
' style=
Date:  1-29-2014
Number of Hours:  3.50
Manual Reference:  
Brief Description:  S/B 13-12-19 Fuel Tank update

Removed the large access plate and cleaned the sealant from teh mating surfaces.
Checked the fuel level sender for accurate position.
Prepared to install the beef up plates.
Tested a sample of the PRC tha I have for proper sealing.
Reseated the emgine block heater to 60 ft. lbs. torque. It was still leaking.
' style=

Tank and bulkhead doublers

Tank and bulkhead doublers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.