No pice for this, tomorrow, as parts are drying and spread over the workshop.
I clecoed the mid cabin braces to the LG boxes, the upper braces having been clecoed to the LG yesterday. I drilled the #30 rivet holes to full size as well as the #12 bolt holes, on all four braces as required. I removed them from the LG boxes and machine dimpled the rivet holes on the mid cabin braces that will hold the nutplates on them. I then carried out all edging and deburing on the four braces and primed them. I'll leave them to dry overnight as the paint is still vunerable to damage until it has time to dry overnight.
Tomorrow I'll rivet the nutplates onto the mid cabin braces and then rivet all four braces to the LG boxes.