KitLog pro

Powered By Kitlog Pro v2.0

Rogers Web Site
' style=
Date:  7-14-2013
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Right L/E and fuel tank

I re assembled th eright L/E and clecoed it to the spar. I then clecoed the right fuelt tank to the spar as well, drilling the W-423, ribs and baffle to final size, there are about 10 innermost rivet holes on the lower skin which have to be drilled off of the spar because to drill them while the tank is on the spar, the drill bit will contact the spar.

I then removed the fuel tank and drilled the last remaining baffle rivet holes, and drilled through the fuel cap housing clecoing it to the skin as well as the fuelt drain. All in all a good days work.
' style=

Right L/E and fuel tank clecoed to the spar.

Right L/E and fuel tank clecoed to the spar.

' style=

The right fuel tank after drilling to full size

The right fuel tank after drilling to full size

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.