Powered By Kitlog Pro v2.0
Frank's Panther Cave
Panther LSA
Empennage
4-5-2014
< Previous Log Entry
Next Log Entry >
Date:
4-5-2014
Number of Hours:
4.00
Manual Reference:
Brief Description:
Horizontal Stabiliser
Continuation of match drilling all #40 holes on bottom then upsizing to #30, rotate frame and screw down again then match drill the two hinges into position as per plans and then up drill all holes to #30.
Whole assemble was them stripped ready to deburr.
Drilling
More match drilling
Almost all drilled to #30
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Corby Starlet Home
Panther LSA Home
Category
# Logs
# Hours
All
123
1991
Avionics
3
38
Canopy
5
21
Controls
5
16
Empennage
31
329
Fuel Tanks
14
38
Fuselage
34
1158
Miscellaneous
3
38
Spar
10
77
Tailcone
7
31
Tools
2
Wings
9
245
Copyright © 2001-2024 Matronics. All Rights Reserved.