Powered By Kitlog Pro v2.0
Frank's Panther Cave
Panther LSA
Empennage
12-21-2013
< Previous Log Entry
Next Log Entry >
Date:
12-21-2013
Number of Hours:
1.50
Manual Reference:
Brief Description:
Elevator
Removed the 1/8" from the underlap for a better fit and deburred the skin.
Trimmed the two ribs as per the plans and checked against the skin before cutting.
Marked out, cut and bent the trim tab spars as per plan detail.
Trim Tab Spars
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Corby Starlet Home
Panther LSA Home
Category
# Logs
# Hours
All
123
1991
Avionics
3
38
Canopy
5
21
Controls
5
16
Empennage
31
329
Fuel Tanks
14
38
Fuselage
34
1158
Miscellaneous
3
38
Spar
10
77
Tailcone
7
31
Tools
2
Wings
9
245
Copyright © 2001-2024 Matronics. All Rights Reserved.