Continuation of fitting elevator pushrod assembly.
Fuselage sides modified for exit hole to flaps (eleongated hole required due to cutout error). Nylon sperical bearing installed. Flap handle assembled with inner tube and spring conneted to indent plate and fitted into fuselage.