Powered By Kitlog Pro v2.0
Frank's Panther Cave
Panther LSA
All
12-29-2016
< Previous Log Entry
Next Log Entry >
Date:
12-29-2016
Number of Hours:
2.00
Manual Reference:
Brief Description:
Control stick mixer
Assembly and trial fit of control stick mixer, washers added between bearings to match the fixed distance of mounting holes and allow free movement of bearing assembly. Once assembled the movement is very smooth.
Large washer stops bearing from coming out
Special manufactured bearing housings by SPA
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Corby Starlet Home
Panther LSA Home
Category
# Logs
# Hours
All
123
1991
Avionics
3
38
Canopy
5
21
Controls
5
16
Empennage
31
329
Fuel Tanks
14
38
Fuselage
34
1158
Miscellaneous
3
38
Spar
10
77
Tailcone
7
31
Tools
2
Wings
9
245
Copyright © 2001-2024 Matronics. All Rights Reserved.