KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
1388 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-19-2013
3.0
Secure Prop Control Cable
Details
       

 05-19-2013
3.0
Oil Cooler Vent & Fuel and Oil Pressure Sensors
Details
       

 05-18-2013
6.0
Exhaust and Engine Sensors
Details
       

 05-17-2013
2.0
Oil Cooler, RMP Sensor, and Oil Pressure Switch
Details
       

 05-16-2013
2.0
Oil Breather Tube
Details
     

 05-16-2013
3.0
Fuel Lines
Details
       

 05-15-2013
4.0
Fuel Flow Sensor Mount and Ram Air Control Cable
Details
       

 05-14-2013
4.0
Fuel Flow Sensor Mount and Excess Fuel tube
Details
       

 05-13-2013
1.0
Elevator Control and Mixture Control
Details
       

 05-11-2013
3.0
Engine Sensors and Mixture Control Cable
Details
       

 05-09-2013
4.0
Mixture Control Cable
Details
     

 05-08-2013
6.0
Governor and Mixture Control Cables
Details
       

 05-06-2013
4.0
Engine Sensor Termination
Details
     

 05-04-2013
3.0
Fuel Injection and Purge Valve Control Cable
Details
       

 05-04-2013
3.0
Control Cables #2
Details
       

 05-03-2013
0.0
AFS 4500
Details

 05-02-2013
6.0
Control Cables
Details
       

 04-30-2013
3.0
Heater Control Cables & Purge Valve Control Cable
Details
       

 04-30-2013
3.0
Baffling
Details
       

 04-28-2013
3.0
Heat Shields and Heater Cable Adel Clamps
Details
       

 04-27-2013
3.0
Trim Heater Control Cables & Engine Instrumentatio
Details
       

 04-27-2013
4.0
Heat Shields for Control Cables
Details
       

 04-26-2013
1.0
GTN650 & Oil Pressure
Details
       

 04-25-2013
0.5
GTN650
Details

 04-23-2013
1.5
Engine Wiring
Details
     

 04-21-2013
8.0
Lower Console, Engine Mount, & Purge Valve
Details
       

 04-20-2013
7.0
Lower Console
Details
       

 04-17-2013
2.0
AFS EFIS and GTN650
Details
     

 04-16-2013
2.0
GPS Troubleshooting
Details
       

 04-15-2013
3.0
GTN650 Configuration
Details
       

 04-14-2013
8.0
Panel, Heat, Nav, and Magnetos
Details
       

 04-13-2013
8.0
Panel, GPS Antenna, and Magneto Timing
Details
       

 04-12-2013
1.0
Upgrade AFS 3400
Details
     

 04-11-2013
3.0
Finishing mounting the 4500s
Details
       

 04-10-2013
4.0
Install AFS EFIS Screens
Details
     

 04-08-2013
3.0
Panel
Details
       

 04-07-2013
8.0
Mags, Throttle Quadrant, Glareshield, Heater Contr
Details
       

 04-06-2013
8.0
Panel Wiring
Details
       

 04-05-2013
3.0
Panel Wiring
Details

 04-04-2013
2.5
Rudder Trim
Details

 04-03-2013
3.0
Left Panel Insert and Throttle Quadrant
Details
       

 04-02-2013
3.0
GTN650 Fan and Final Panel Wiring
Details
       

 04-01-2013
2.5
Center Panel
Details
     

 03-31-2013
8.0
Central Panel / Radio Stack
Details
       

 03-30-2013
6.0
Rudder Trim and Panel Switches
Details
       

 03-29-2013
5.0
Panel Wiring
Details

 03-28-2013
2.0
Battery Tray, Seat Release Arm, and Throttle Quadr
Details
       

 03-27-2013
2.0
Thread Throttle Lock and Baffle Rod
Details
       

 03-24-2013
4.0
Throttle Quadrant
Details
       

 03-24-2013
1.0
Rudder Trim and Alternate Static Air Switch
Details
       

 03-24-2013
2.0
Install Static, and Pitot Quick Disconnects, and A
Details
       

 03-23-2013
3.0
Spark Plug Wire Holders and Engine Mount Covers
Details
       

 03-23-2013
3.0
Baffle and Engine Heater
Details
       

 03-22-2013
1.5
Baffle Install
Details
     

 03-21-2013
2.0
Equipment Port Mapping
Details

 03-18-2013
2.0
Gemini and TS-83 wrining installation
Details
       

 03-17-2013
5.0
Continued panel installation
Details
       

 03-16-2013
5.0
Left Panel Wiring and Seat Levers
Details
       

 03-15-2013
5.0
Left Wing Root WIring and Overhead Inserts
Details
       

 03-12-2013
2.0
Elevator Trim and Overhead Inserts
Details
       

 03-11-2013
2.0
Installed 4 adel clamps in tail
Details
       

 03-10-2013
5.0
Wing Walk and Headliner Installation
Details
       

 03-10-2013
1.0
Installed foil insulation on the lower cowl
Details
     

 03-09-2013
3.0
Wing Tip, Baffles, Wiring Prep
Details
       

 03-09-2013
3.0
Pitot and AOA lines, Wing Root Connector
Details
       

 03-08-2013
1.0
Left Headliner
Details
     

 03-07-2013
2.0
Right Headliner
Details
       

 03-05-2013
1.0
Left Headliner
Details
     

 03-03-2013
6.0
Wing Tips
Details
       

 03-02-2013
3.0
Tail Light & Panel
Details
       

 03-02-2013
3.0
Pitot
Details
       

 02-25-2013
2.0
Antenna Cables and Drill Hole in Fuselage
Details
       

 02-24-2013
2.0
Tail Position & Strobe Light and Elevator Trim
Details
       

 02-24-2013
2.0
Insulation
Details
     

 02-24-2013
2.0
ADSB UAT, APRS, and ELT Antenna Installation
Details
       

 02-23-2013
4.0
Seats & Misc.
Details
       

 02-21-2013
1.0
Labeled Inserts and Clear Coat
Details
     

 02-20-2013
1.0
Paint Panel Inserts
Details
     

 02-17-2013
5.0
Seats, Wing Attach, & Overhead
Details
       

 02-16-2013
4.0
VP/X, Flap, and Transponder Antenna
Details
       

 02-10-2013
4.0
Left Wing and VP/X-Pro
Details
       

 02-09-2013
1.0
Wings Installation #2
Details
       

 02-09-2013
1.0
Final Wing Installation
Details
       

 02-08-2013
2.0
OAT
Details

 02-07-2013
2.0
Door Trim, OAT, and Hangar Cleanup
Details
       

 02-06-2013
2.0
Aileron Trim, Wing Wires, Rear Seat Air Vents
Details
       

 02-05-2013
2.0
AIleron Trim & Wing Wiring
Details
       

 02-03-2013
5.0
Ailerons & Flaps
Details
       

 02-02-2013
4.0
Transponder Antenna, Wing Connector, Ailerons
Details
       

 02-02-2013
1.0
Brake Fluid
Details
       

 01-30-2013
2.0
Comm Antenna & Aileron Gap Seal
Details
       

 01-29-2013
2.0
Left Comm Antenna Access Plate and Left Seat Rail
Details
       

 01-28-2013
2.0
Comm Antenna Access Plate
Details
     

 01-27-2013
3.0
Seats Rails, Insulation, and Comm Antenna cable ru
Details
       

 01-27-2013
0.0
Picked up last pieces to be painted
Details
     

 01-26-2013
5.0
Flap Switch, Rudder, Audio DB37, & Seat Rails
Details
       

 01-24-2013
1.0
Right Headliner Insert
Details
     

 01-23-2013
2.0
Passenger Headset Jacks
Details
     

 01-21-2013
1.0
Left Headliner Panel
Details
     

 01-20-2013
6.0
Wing Root Connectors & Audio Panel Connector
Details
       

 01-19-2013
4.0
Flap Sensor and Flaps
Details
       

 01-18-2013
0.0
Picked up the painted Wheel Pants
Details
       

 01-17-2013
2.5
Install Rudder and Elevators
Details
       

 01-15-2013
2.0
Taped Striping on Wheel Pants
Details
       

 01-14-2013
0.0
Paint Gray on Wheel Pants
Details
       

 01-13-2013
2.0
Panel Inserts
Details
       

 01-13-2013
2.0
Painted the Cabin Cover, Seat Access Cover, and Ba
Details
       

 01-13-2013
2.0
Finshing Riveting Nutplates and Attach Vertical St
Details
     

 01-12-2013
0.0
Tech Counselor Visit
Details
     

 01-12-2013
2.0
Tape Gray Line on Wheel Pants
Details
       

 01-12-2013
4.0
Install Reiff Engine Heaters
Details
       

 01-11-2013
0.0
White Paint on Wheel Pant
Details
     

 01-05-2013
4.0
Move Wings Back to the Hangar
Details
       

 01-04-2013
1.0
Countersink Wheel Pant Holes
Details
     

 01-03-2013
1.0
Marked up Panel Inserts
Details

 12-30-2012
4.0
VPX, NAV Antenna, and Horizontal
Details
       

 12-27-2012
2.0
Taping the Red Stripe on the Left Wing
Details
       

 12-27-2012
0.0
Painted Silver Stripe on Left Wing
Details
       

 12-22-2012
1.0
Tape Silver Stripe on Left Wing #2
Details
       

 12-22-2012
1.0
Tape Silver Stripe on Left Wing
Details
       

 12-16-2012
1.0
Swapped Left and Right Wing in Rotissorie
Details
       

 12-10-2012
1.0
Taped Right WIng for Outward Silver Stripes
Details
       

 12-09-2012
5.0
Taped Red and Sliver Stripes on Right Wing
Details
       

 12-09-2012
1.0
Started to install panel components
Details
       

 12-08-2012
0.0
Painted Gray on the Right Wing
Details
       

 12-08-2012
6.0
Left Wing Connector
Details
       

 12-06-2012
0.5
Attached Rudder Fairing Covers
Details
     

 12-05-2012
1.0
Prep wing for painting
Details
       

 12-03-2012
3.0
Taped gray areas on right wing
Details
       

 12-02-2012
0.0
Right Wing Paint
Details
       

 12-02-2012
4.0
Right Wing Connector #2
Details
       

 12-01-2012
5.0
Horizontal, Doors, and Mags
Details
       

 11-29-2012
2.0
Wing Root Connectors #2
Details
     

 11-27-2012
1.5
Assemble wing stands
Details
       

 11-26-2012
1.5
Left Wing Root Connector
Details
       

 11-25-2012
2.0
Moved Wings to the Paint Shop
Details
       

 11-24-2012
0.0
Moved Fuselage back to the hangar #3
Details
       

 11-24-2012
0.0
Moved Fuselage back to the hangar #2
Details
       

 11-24-2012
0.0
Moved Fuselage back to the hangar
Details
       

 11-20-2012
0.0
N#s and Red Stripe #2
Details
       

 11-20-2012
0.0
N#s and Red Stripe #1
Details
       

 11-18-2012
2.0
Clear Coat Panel Inserts and Clean Hangar
Details
       

 11-15-2012
1.0
Left Side N# Paint Mask
Details
     

 11-14-2012
3.0
Red Stripe on Left Side of Fuselage
Details
       

 11-13-2012
4.0
Taping Red Stripe on Fuselage
Details
       

 11-12-2012
1.5
Putting the doors on
Details
       

 11-11-2012
0.0
Silver Stripe and Clear Coat Painted on Fuselage
Details
       

 11-11-2012
1.0
Painted Instrument Panel & Hangar Cleaning
Details
       

 11-10-2012
1.5
Tape Silver Stripe
Details
       

 11-10-2012
4.0
Re-Painted Panel
Details
       

 11-09-2012
0.0
Phantom Pray Painted on Fuselage
Details
       

 11-04-2012
3.5
Taped the Phantom Gray line on Fuselage
Details
       

 11-03-2012
3.0
Panel Labeling
Details
       

 11-02-2012
0.0
White on Fueslage
Details
       

 11-02-2012
3.0
Painting Aerosport Panels
Details
     

 10-28-2012
4.5
Instrument Panel and Bafflers #2
Details
       

 10-27-2012
0.5
Remote Control for heater
Details
     

 10-27-2012
6.0
Instrument Panel and Baffles
Details
       

 10-25-2012
0.0
Sanding Primer on Fuselage
Details
       

 10-24-2012
0.0
Epoxy Primer on the Fuselage
Details
       

 10-24-2012
2.0
Baffles and Instrument Panel
Details
       

 10-23-2012
1.0
Taping the Fuselage
Details
       

 10-22-2012
2.0
Baffles and Instrument Panel
Details
       

 10-21-2012
6.0
Baffles & Instrument Panel
Details
       

 10-20-2012
1.5
Paint Screw Caps and Throttle Quadrant Insert
Details
       

 10-19-2012
2.0
Painted Baggage Door and Interior Door Handles
Details
       

 10-18-2012
2.0
Paint Panel Inserts & Filler on Instrument Panel
Details
       

 10-17-2012
2.0
Paint Aerosport Interior Panels and Panel Inserts
Details
       

 10-15-2012
2.0
Tape and Filler
Details
       

 10-14-2012
2.5
Cabin Cover Interior Paint
Details
       

 10-13-2012
4.0
Fuselage move to the paint shop
Details
       

 10-12-2012
2.5
Fuselage Prep
Details
       

 10-12-2012
0.0
Clear coating the tail feathers
Details
       

 10-11-2012
3.5
Silver on the tail feathers
Details
       

 10-10-2012
0.0
Phantom Gray on the tail feathers
Details
       

 10-09-2012
4.0
Covered the parts and painted the red striping
Details
       

 10-08-2012
2.5
Finish Taping and Re-Hanigng Parts
Details
       

 10-07-2012
5.0
Tape the Horitzontal and Vertical
Details
       

 10-06-2012
5.0
Doors, Cabin Cover, Stick, and a little proseal
Details
       

 10-05-2012
2.0
White Paint - Tail Feathers & Cowl
Details
       

 10-04-2012
2.0
Primer - Tail Feathers & Cowl
Details
       

 10-03-2012
2.5
Paint Prep #2 - Tail Feathers and Cowl
Details
       

 10-02-2012
3.5
Paint Prep - Tail Feathers & Cowl
Details
       

 10-01-2012
1.0
Stick & Nose Wheel
Details
       

 09-30-2012
5.0
Sticks and Cabin Cover Door Frame
Details
       

 09-29-2012
4.0
Transport to the Painter
Details
       

 09-29-2012
4.0
Stick, Nose Wheel, & Cabin Cover
Details
       

 09-28-2012
2.5
Rudder, Interior Panels, & Horizontal
Details
       

 09-27-2012
2.6
Stick Wiring & Cleaning Tail Feathers
Details
       

 09-26-2012
2.0
Doors, Stick Wiring, and Tail Feather Cleaning
Details
       

 09-25-2012
2.5
Doors, Cowl, and Scoop
Details
       

 09-24-2012
2.5
Doors, Scoop, and Hangar Lights
Details
       

 09-23-2012
6.0
Doors & Interior #3
Details
       

 09-22-2012
3.0
Interior Panels
Details
     

 09-21-2012
0.0
Seats
Details
       

 09-19-2012
2.0
Doors and Interior #2
Details
       

 09-18-2012
2.5
Doors and Interior Panels
Details
       

 09-16-2012
6.5
Scoop & Lights
Details
       

 09-15-2012
8.0
Doors, Scoop, and Lights
Details
       

 09-14-2012
2.5
Doors & Interiors
Details
       

 09-13-2012
2.5
Aerosport Interior and Scoop
Details
       

 09-11-2012
2.5
Doors and Scoop
Details
       

 09-10-2012
2.5
Door Hinge Covers & Doors
Details
       

 09-06-2012
2.0
OAT, Doors, Scoop, and Rudder
Details
       

 09-05-2012
2.5
Cowl & Doors
Details
       

 09-03-2012
8.0
Cowl Finishing
Details
       

 09-02-2012
8.0
Cowl & Eppennage
Details
       

 09-01-2012
4.0
Wing Access Panels
Details
       

 09-01-2012
4.0
Cowl and Wing Access Panels
Details
       

 08-31-2012
2.5
Wing Access Panel & Cabin Cover
Details
       

 08-30-2012
2.5
Cowl, Doors, and Elevators
Details
       

 08-29-2012
2.5
Cowl & Doors
Details
       

 08-28-2012
2.5
Cowl and Scoop #2
Details
     

 08-27-2012
1.0
Doors and Door Frame
Details
       

 08-27-2012
1.5
Cowl and Scoop
Details
       

 08-26-2012
4.0
Doors
Details
       

 08-26-2012
4.0
Cowl
Details
       

 08-25-2012
5.0
Cabin Cover, Cowl, & Aerosport Products Panels
Details
       

 08-25-2012
2.0
Cabin Cover & Door Windows
Details
       

 08-24-2012
2.5
Cowl, Baffles, and Cabin Cover
Details
       

 08-23-2012
2.5
Oil Door, Cowl, and Cabin Cover
Details
       

 08-22-2012
2.5
Doors, Cabin Cover, and Cowl
Details
       

 08-21-2012
2.5
Door Windows Again!
Details
       

 08-20-2012
2.5
Door Windows
Details
       

 08-19-2012
7.0
Nose Wheel, Doors, Cabin, and Cowl
Details
       

 08-18-2012
2.0
Nose Wheel Pant & Fairings
Details
       

 08-18-2012
4.0
Doors & Windows
Details
       

 08-18-2012
2.0
Cabin Cover
Details
       

 08-17-2012
2.5
Doors, Flaps, and Cabin Cover
Details
       

 08-16-2012
3.0
Doors, Flaps, Nose Wheel Pants, and Cabin Cover
Details
       

 08-15-2012
3.5
Door Windows and Cabin Cover
Details
       

 08-14-2012
3.0
Door Windows
Details
     

 08-13-2012
2.0
Doors, Cabin Cover, and Hangar Lighting
Details
       

 08-12-2012
5.0
Doors, Nose Wheel Pants, & Cabin Cover #2
Details
       

 08-11-2012
6.0
Doors, Nose Wheel Pants, & Cabin Cover
Details
       

 08-10-2012
2.5
Doors
Details
     

 08-09-2012
2.5
Door Windows
Details
       

 08-08-2012
2.5
Doors and Windows #2
Details
       

 08-07-2012
3.0
Doors and Door Windows
Details
       

 08-06-2012
2.5
Doors, Nose Wheel Pant, and Cowl
Details
       

 08-05-2012
5.0
Doors. Nose Wheel, Cowl. & Cabin Cover
Details
       

 08-04-2012
6.0
Cowl, Doors, and Nose Wheel
Details
       

 08-03-2012
2.0
Sanded Oil Filler Door Opening
Details
       

 08-02-2012
2.5
Cowl
Details
       

 08-01-2012
3.0
Cowl, Doors, and Wheel Pants
Details
       

 07-31-2012
2.5
Cowl and Cabin Cover
Details
       

 07-30-2012
2.5
Cabin Cover and Cowl
Details
       

 07-29-2012
6.5
Doors and Cowl
Details
       

 07-28-2012
3.5
Doors and Oil Door
Details
       

 07-28-2012
4.0
Cowls
Details
       

 07-27-2012
2.5
Doors #8
Details
     

 07-26-2012
2.5
Body Icing on Door Interiors #7
Details
     

 07-21-2012
0.0
Oshkosh
Details

 07-18-2012
3.0
Doors #6
Details
     

 07-16-2012
3.0
Doors #5
Details
       

 07-15-2012
0.0
Seats
Details
       

 07-15-2012
6.0
Cabin Cover & Doors #4
Details
       

 07-14-2012
8.0
Doors & Cabin Cover #3
Details
       

 07-13-2012
3.0
Left Door Lock
Details
     

 07-12-2012
3.0
Door Lock and Cabin Cover
Details
       

 07-11-2012
3.0
Door Lock and Nose Wheel Pant
Details
       

 07-09-2012
2.5
Cabin Cover & Nose Wheel Pant #2
Details
       

 07-08-2012
6.0
Cabin Cover & Nose Wheel
Details
       

 07-07-2012
7.0
Wheel Pants and Cabin Cover
Details
       

 07-06-2012
4.0
Nose Wheel Pant and Wing Tip
Details
       

 07-05-2012
2.5
Wing Tip, Doors, and Cabin Cover
Details
       

 07-04-2012
8.0
Cabin Cover and Wheel Pants
Details
       

 07-03-2012
2.5
Doors
Details
       

 07-02-2012
3.0
Wheel Pants & Doors
Details
       

 07-01-2012
7.0
Cabin Cover, Doors, & Wheel Pants
Details
       

 06-30-2012
8.0
Cabin Cover, Doors, & Wheel Pants
Details
       

 06-29-2012
1.0
Windscreen
Details
     

 06-28-2012
1.0
Windscreen
Details
     

 06-27-2012
3.0
Windscreen, Wheel Pants, & Gemini PFD
Details
       

 06-26-2012
3.0
Windscreen & Doors
Details
     

 06-25-2012
3.0
Windows, Wing Tips, & Wheel Pants
Details
       

 06-24-2012
2.0
Wing Tip Lense
Details
       

 06-24-2012
6.0
Windows #4
Details
       

 06-23-2012
8.0
Windows #3
Details
     

 06-22-2012
3.0
Windows #2
Details
       

 06-21-2012
3.0
More micro on the windows
Details
       

 06-20-2012
2.5
Windscreen Fairing
Details
     

 06-19-2012
2.0
Micro to Windscreen and Wheelpants
Details
       

 06-18-2012
2.0
Sand Windscreen Fairings
Details

 06-17-2012
1.0
Glareshield Template
Details
     

 06-17-2012
6.0
Fiberglass window joints
Details
       

 06-16-2012
6.0
Fiberglass Windscreen
Details
       

 06-15-2012
2.0
Nose Wheel
Details
     

 06-14-2012
2.0
Windscreen and Nose Wheel
Details
       

 06-12-2012
2.5
Tape the windows, prep for fiberglassing the joint
Details
       

 06-10-2012
6.0
Windshield, Nose Wheel Pants, & Wingtip
Details
       

 06-09-2012
5.0
Front Window
Details
       

 06-07-2012
2.0
Rudder trim and cabin cover window brace
Details
       

 06-07-2012
1.0
Empennage Fairing and Wing Tip
Details
       

 06-06-2012
2.0
Trim Front Window
Details
     

 06-05-2012
1.5
Rear Windows and Wing Tips
Details
       

 06-04-2012
2.0
Empennage Fairing, Flaps, and Wing Tip
Details
       

 06-03-2012
3.0
Rear Windows
Details
       

 06-03-2012
4.0
Empennage Fairing, Wing Tips, and Flaps
Details
       

 06-02-2012
6.0
Cabin Cover and WIng Tips
Details
       

 05-31-2012
3.0
Sanding the horizontal, flaps, and empennage fairi
Details
       

 05-30-2012
3.0
Horizontal, Flasp, and Empennage Fairing
Details
       

 05-28-2012
6.0
More sanding and vertical nutplates
Details
       

 05-27-2012
3.0
More sanding......
Details
       

 05-24-2012
1.0
Sanded horizontal fairings
Details
     

 05-22-2012
2.0
Second smooth prime coat
Details
       

 05-18-2012
0.0
Sheppard AFB and Transition Training
Details
     

 05-15-2012
2.0
Horizontal Fairing
Details
       

 05-14-2012
2.0
First smooth prime coat on fairings
Details
       

 05-13-2012
6.0
Fairings and Tail Removal
Details
       

 05-12-2012
6.0
Fairings, Nose Wheel Pant, Tail Electrical, Cabin
Details
       

 05-11-2012
3.0
More Sanding & Micro
Details
       

 05-10-2012
3.0
Rear Window, Headliner, and Wheel Pants
Details
       

 05-08-2012
3.0
Fairings and more Fairings
Details
       

 05-07-2012
2.0
Empennage Fairing
Details
       

 05-06-2012
5.0
Some riveting, some sanding, more micro, and more
Details
       

 05-05-2012
9.0
Last fuselage skin and more fairing work
Details
       

 05-04-2012
3.0
A bunch of misc tasks
Details
       

 05-03-2012
2.0
Countersink APRS Doubler & Pull GPS Antenna Cable
Details
       

 05-02-2012
3.0
Ground Power & Rudder Fairing
Details
       

 05-01-2012
1.5
Aux Battery Charger
Details
       

 04-30-2012
2.0
Vertical Stab Fairing and Battery Ground Terminal
Details
       

 04-29-2012
7.0
Battery Connections and Fairing Sanding
Details
       

 04-28-2012
8.0
Ground Power & More Fairing Sanding
Details
       

 04-27-2012
2.5
Ground Power Plug & Fairing Sanding
Details
       

 04-26-2012
2.0
ELT Doubler and Vertical Fairing
Details
       

 04-24-2012
3.0
GPS Doublers #2 and More Micro
Details
       

 04-23-2012
2.0
GPS Doublers
Details
       

 04-22-2012
5.0
More micro filler and dimple top skin
Details
       

 04-21-2012
6.0
ELT Installation
Details
       

 04-20-2012
1.0
ELT Bracket
Details
       

 04-19-2012
0.0
Steve Stella
Details

 04-18-2012
2.0
Installing adel clamps in the tail
Details
     

 04-16-2012
2.0
Overhead Wiring
Details
       

 04-15-2012
4.0
Static Ports and Empennage Wiring
Details
       

 04-15-2012
2.0
Static Ports and Baggage Bulkhead
Details
       

 04-14-2012
6.0
Misc Wiring
Details
       

 04-13-2012
2.0
Pull Wiring and NACA Valve Installation
Details
       

 04-11-2012
1.0
NACA Air Vent Valve Installation
Details
       

 04-11-2012
1.0
Battery Contactor Wiring
Details
       

 04-11-2012
1.0
Autopilot Pitch Servo Wired
Details
       

 04-09-2012
3.0
Autopilot Wiring
Details
       

 04-08-2012
5.0
Fairings, ADSB, ADSB Antenna
Details
       

 04-07-2012
2.0
Trim Windshield and Glaresheild Template
Details
       

 04-07-2012
0.5
Tech Counselor Visits
Details
       

 04-07-2012
1.0
Removing Wings
Details
       

 04-06-2012
4.0
WIng Root Access Panels
Details
       

 04-06-2012
2.0
Wheel Pants #15
Details
       

 04-05-2012
1.0
Cleanup
Details

 04-04-2012
2.0
Wheel Pants #14
Details
       

 04-03-2012
3.0
Wheel Pants #13
Details
       

 04-02-2012
1.0
Wheel Pants #12
Details
       

 04-02-2012
1.0
Wheel Pants #11
Details
     

 04-02-2012
1.0
Wheel Pants #10
Details
       

 04-01-2012
4.0
Wheel Pants #9
Details
       

 03-31-2012
1.0
Wheel Pants #8
Details
       

 03-31-2012
5.0
Gear Leg Fairings
Details
       

 03-27-2012
3.0
Wheel Pants #7
Details
       

 03-26-2012
1.0
Wheel Pants #6
Details
     

 03-25-2012
6.0
Wheel Pants #5
Details
       

 03-18-2012
2.0
Wheel Pants #4
Details
       

 03-18-2012
4.0
Wheel Pants #3
Details
       

 03-18-2012
0.0
Airplane Jacks
Details
       

 03-17-2012
3.0
Wheel Pants #2
Details
       

 03-17-2012
0.5
Farings #5
Details
       

 03-15-2012
1.5
Wheel Pants and Pitch Servo Mount
Details
       

 03-15-2012
1.5
Fairings #4
Details
       

 03-14-2012
2.0
Fairings #3 and Wheel Pants
Details
       

 03-13-2012
2.0
Fairings #2
Details
       

 03-12-2012
0.5
Riveted Horizontal Fairings
Details
       

 03-12-2012
2.0
Glassing tail fairings
Details
       

 03-11-2012
4.0
Tail fairings
Details
       

 03-09-2012
1.0
ADSB DB-37
Details
     

 02-28-2012
2.0
Crossbow Magnetometers wired
Details
       

 02-27-2012
1.5
Install Magentometers
Details
     

 02-26-2012
4.0
Magnetomer Tray
Details
       

 02-25-2012
6.0
Misc Panel
Details
       

 02-23-2012
1.0
Magnetometers
Details
     

 02-22-2012
1.5
Annuciator Wiring Change
Details
     

 02-21-2012
1.5
Auto Pilot Switch
Details
       

 02-19-2012
4.0
More Panel Wiring
Details
     

 02-18-2012
5.0
CO & CLA Wiring, Upgrading Adel Clamps
Details
       

 02-16-2012
2.0
CO Wiring
Details
     

 02-15-2012
0.0
Air Compressor Back
Details
     

 02-12-2012
4.0
Ignition Switch Wiring, Magnetometer Mount, & Door
Details
       

 02-05-2012
5.0
Panel Switch Wiring and Door Remount
Details
       

 02-04-2012
5.0
Panel Switch Wiring and Compressor Repair
Details
     

 02-02-2012
3.0
Switch Wiring
Details
     

 01-29-2012
4.0
Switch & LED wiring
Details
       

 01-28-2012
6.0
Switch & LED Wiring
Details
       

 01-24-2012
1.5
Panel switch assembly
Details
     

 01-22-2012
4.0
Panel Supports
Details
       

 01-21-2012
4.0
Radio Stack Support
Details
       

 01-17-2012
2.0
More nutplates on the panel
Details
       

 01-15-2012
4.0
Misc Panel Tasks
Details
       

 01-11-2012
2.0
Door switches and Fuel Lines
Details
       

 01-10-2012
2.0
Panel Wiring
Details
     

 01-09-2012
1.5
Right Side Panel Wiring
Details
     

 01-08-2012
5.0
Panel & Wiring
Details
       

 01-07-2012
6.0
Panel Inserts & Misc
Details
       

 01-04-2012
0.0
Center Panel Insert
Details
     

 01-01-2012
3.5
Throttle Quadrant, Upper Fuselage Assembly, & Cabi
Details
       

 12-31-2011
4.0
More Panel #2 and Riveting
Details
       

 12-28-2011
2.0
Cutting holes in the carbon fiber panel
Details
       

 12-26-2011
4.0
More wiring and some riveting
Details
       

 12-25-2011
0.0
Panel Layout
Details
     

 12-24-2011
4.0
Pulling wire
Details
       

 12-24-2011
2.0
Panel Inserts and Firewall Passthrough
Details
     

 12-23-2011
0.0
Picked up panel inserts from Aerosport Products
Details
     

 12-20-2011
3.0
Riveting the upper fuselage assembly
Details
       

 12-19-2011
4.0
Started to install upper fuselage assembly
Details
       

 12-18-2011
6.0
More Panel Wiring
Details
       

 12-17-2011
3.0
Wired G3i Ignition
Details
       

 12-17-2011
2.0
More wiring support
Details
       

 12-17-2011
3.0
Manifold Pressure
Details
       

 12-14-2011
2.0
Cleaning up the wiring
Details
       

 12-13-2011
2.0
Wired Strobes Circuit & AFS EFIS
Details
     

 12-10-2011
4.0
Annunciator Board and Fuel Lines
Details
       

 12-04-2011
4.0
Fans and Door Relays
Details
       

 12-03-2011
4.0
Installed shelf for ADSB and antenna doubler
Details
       

 12-03-2011
1.0
Install defroster fans
Details
       

 11-30-2011
2.0
Wire Mgmt and Fuel Lines
Details
       

 11-29-2011
2.0
Finish radio stack mount
Details
       

 11-28-2011
2.5
Radio Stack Mount
Details
       

 11-27-2011
3.0
Install insulation and start radio stack mount
Details
       

 11-26-2011
6.0
Installed brake lines
Details
       

 11-25-2011
4.0
Moved Upper Fueselage Assembly back to the hangar
Details
       

 11-24-2011
6.0
More panel work
Details
       

 11-15-2011
2.0
Firewall Insulation
Details
       

 11-14-2011
6.0
Re-plumbing the fuel lines
Details
       

 11-06-2011
10.0
Working on the harness
Details
       

 11-01-2011
2.0
Baffling & Battery
Details
       

 10-30-2011
4.0
Misc Catch Up Items
Details
       

 10-29-2011
6.0
GTN 650, PSE 8000B, and GTX 327 wiring
Details
       

 10-27-2011
0.0
AFS AP arrives
Details

 10-23-2011
1.0
Tail weight
Details
       

 10-23-2011
1.0
Jack Stands
Details
     

 10-23-2011
2.0
Baffle Re-work
Details
       

 10-23-2011
2.0
Alternator Spacers Re-Work
Details
       

 10-09-2011
4.0
Install Starter and Alternator
Details
       

 10-09-2011
2.0
Battery Cables
Details
       

 10-02-2011
4.0
AFS Main EFIS Connectors Completed
Details
       

 09-25-2011
3.0
Started fuselage electrical
Details
       

 09-25-2011
3.0
Misc items
Details
       

 09-17-2011
2.0
VP-X J-2 Connector
Details
       

 09-14-2011
4.0
VP-X J1 Connector Completed
Details
       

 09-11-2011
10.0
Panel Wiring #2
Details
       

 09-05-2011
20.0
Wiring of VP-X power connectors
Details
     

 08-29-2011
1.5
Mounting panel devices #2
Details
       

 08-29-2011
0.5
Drilling out stainless shields
Details
     

 08-28-2011
4.0
Mounting more devices
Details
       

 08-27-2011
6.0
VP-X, Electronic Ignition, Wire Pass Throughs
Details
       

 08-26-2011
2.0
VP-X Pro installation
Details
       

 08-24-2011
1.5
Door Handles
Details
       

 08-23-2011
2.0
Reassmeble of door handles
Details
     

 08-22-2011
2.0
Re-hang left exhaust
Details
       

 08-21-2011
2.0
APRS Antenna Doubler
Details
       

 08-20-2011
8.0
Antenna Doublers
Details
       

 08-19-2011
2.0
Installing the VP-X Pro
Details
       

 08-19-2011
0.0
Chloe
Details
       

 08-15-2011
2.0
Misc Panel Tasks
Details
       

 08-14-2011
5.0
Baffles #20
Details
       

 08-13-2011
3.0
Wing Tips #7
Details
       

 08-13-2011
3.0
Baffles #19
Details
       

 08-12-2011
2.0
Baffles #18
Details
       

 08-08-2011
3.0
Baffles #17
Details
       

 08-07-2011
4.0
Baffles #16
Details
       

 08-06-2011
0.0
Avionics started to arrive
Details
       

 08-05-2011
1.0
Wing Tips #5
Details
       

 08-05-2011
2.0
Air ramps fabricated
Details
       

 08-03-2011
2.0
Wing Tips & Rudder Stop
Details
       

 08-01-2011
0.0
Airventure
Details

 07-17-2011
4.0
Exhaust #4
Details
       

 07-16-2011
3.0
Exhaust #3
Details
       

 07-14-2011
1.0
AFS CHT Installation
Details
       

 07-13-2011
2.0
Exhaust #2
Details
       

 07-11-2011
2.0
Baffles #15
Details
       

 07-10-2011
1.0
Match drill, dimple, and primed fairing supports
Details
     

 07-10-2011
4.0
Drain oil, install exhaust pipes, and EGT sensors
Details
       

 07-09-2011
0.1
Dimple Rudder for Fairing
Details
     

 07-08-2011
1.0
Wing Root Faring -Redux
Details
       

 07-08-2011
2.0
Rudder Fairing and Strobe
Details
       

 07-08-2011
1.0
Nav Lights
Details
       

 07-07-2011
1.0
Baffles #14 and Wing Tip Lights
Details
       

 07-06-2011
2.0
Baffles #13
Details
     

 07-04-2011
2.0
Baffles #12
Details
       

 07-03-2011
5.0
Baffles #11
Details
       

 07-02-2011
4.0
Baffles #10
Details
       

 07-01-2011
2.0
Baffles #9
Details
       

 06-30-2011
0.5
Baffles #8
Details
       

 06-30-2011
0.5
Baffles #7
Details
       

 06-30-2011
1.0
Baffles #6
Details
       

 06-29-2011
2.0
Baffle #5
Details
       

 06-27-2011
2.0
Wing Tip & Baffle
Details
       

 06-26-2011
2.0
Wing Tips #4
Details
       

 06-26-2011
2.0
Right Wing Root Faring
Details
     

 06-25-2011
1.0
Left Wing Root Fairing
Details
     

 06-21-2011
1.0
Aileron Trim #2
Details
     

 06-19-2011
4.0
Wing Tip #4, Aileron Trim
Details
       

 06-18-2011
4.0
Wing Tips #3
Details
       

 06-17-2011
1.0
Wing Tips #2
Details
       

 06-16-2011
0.0
New Compressor
Details
       

 06-13-2011
1.5
Cowl #2
Details
       

 06-12-2011
2.0
Wing Tips
Details
       

 06-12-2011
2.0
Wing Root Fairings #4
Details
       

 06-12-2011
2.0
Cowl
Details
       

 06-10-2011
1.0
Wing Root Fairings #3
Details
       

 06-10-2011
0.0
Technical Counselor Visit
Details
     

 06-09-2011
2.0
Cowl, Wings, and Rudder
Details
       

 06-07-2011
2.5
Wing Root Fairings #2
Details
       

 06-06-2011
2.0
Wing Root Fairings
Details
       

 06-05-2011
5.0
Flaps and Ailerons
Details
       

 06-04-2011
2.0
Wing Attach
Details
       

 06-04-2011
2.0
Aileron Pushrods
Details
       

 06-04-2011
2.0
Aileron and Flaps
Details
       

 06-01-2011
1.0
Seat Supports
Details
     

 05-31-2011
2.0
Wing Attach and Ailerons
Details
       

 05-28-2011
3.0
Cowl and Wing Attach
Details
       

 05-27-2011
1.0
Cowl Mod and Wing Fairings
Details
       

 05-26-2011
2.0
Attaching Cabin Cover
Details
     

 05-25-2011
2.0
Wing Attach and Cabin Cover Attach
Details
       

 05-24-2011
2.0
Cabin Cover and Cowl #11
Details
       

 05-23-2011
2.0
Cabin Cover and Cowl #10
Details
       

 05-22-2011
6.0
Cabin Cover and Cowl #9
Details
       

 05-21-2011
6.0
Cabin Cover and Cowl #8
Details
       

 05-20-2011
2.0
Cabin Cover #7
Details
       

 05-19-2011
2.0
Cabin Cover #6 and Headliner
Details
       

 05-18-2011
2.0
Cabin Cover and Cowl #5
Details
     

 05-17-2011
2.0
Cabin Cover and Cowl #4
Details
       

 05-15-2011
5.0
Cabin Cover and Cowl #3
Details
       

 05-14-2011
6.0
Cabon Cover and Cowl #2
Details
       

 05-13-2011
2.0
Cabin Cover - one more time #4 / Bottom Cowl
Details
       

 05-12-2011
2.0
Cabin Cover - one more time #3
Details
       

 05-10-2011
2.0
Ram Air Mod
Details
       

 05-10-2011
2.0
Cabin Cover - one more time #2
Details
       

 05-09-2011
2.0
Cabin Cover - one more time
Details
       

 05-08-2011
4.0
Cabin cover and cowl scoop
Details
       

 05-07-2011
3.0
Cowl Hinges
Details
       

 05-07-2011
4.0
Cowl and Cabin Cover
Details
       

 05-05-2011
2.5
Upper Cowl
Details
       

 05-03-2011
2.0
Cowl Pin Hinge Covers #2
Details
       

 05-03-2011
1.5
Baffles #4
Details
       

 05-01-2011
0.8
Empennage Fairings #4
Details
       

 05-01-2011
2.0
Cowl Pin Hinge Covers
Details
       

 05-01-2011
2.0
Cowl Hinges
Details
       

 05-01-2011
2.0
Cabin Cover and Cowl Fairings
Details
       

 05-01-2011
1.0
Baffle #3
Details
     

 04-30-2011
6.0
Cabin Cover, Empennage Fairing, & Cowl
Details
       

 04-28-2011
2.0
Empennage Fairings #3
Details
       

 04-17-2011
2.0
Overhead #5
Details
       

 04-17-2011
3.5
Empennage fairings #2
Details
       

 04-16-2011
1.0
Rudder
Details
     

 04-16-2011
1.5
Overhead #4
Details
       

 04-16-2011
1.0
Install Brakes
Details
       

 04-16-2011
1.0
Elevator Fairings
Details
       

 04-14-2011
2.0
FIlling the cowl
Details
       

 04-12-2011
2.0
Cowl Scoop
Details
     

 04-10-2011
5.0
Overhead #3
Details
       

 04-09-2011
5.0
Cowl #8
Details
     

 04-07-2011
2.0
Cowl #7
Details
       

 04-05-2011
2.0
Cowl #6
Details
       

 04-03-2011
3.0
Cowl #5
Details
       

 04-02-2011
5.0
Cowl #4
Details
       

 03-31-2011
2.0
Baffles #2
Details
       

 03-29-2011
2.0
More Cowl work #3
Details
       

 03-27-2011
3.0
More Cowl work #2
Details
       

 03-26-2011
3.0
More Cowl work
Details
       

 03-24-2011
3.0
Bottom Cowl
Details
       

 03-22-2011
2.0
Top Cowl
Details
       

 03-22-2011
1.0
Bottom Cowl and Inlet Ramps
Details
       

 03-20-2011
4.0
Bower Ram Air - Throttle/Mixture Cable Bracket
Details
       

 03-20-2011
0.3
Baffles
Details
     

 03-19-2011
5.0
Overhead Console #2
Details
       

 03-17-2011
2.0
Overhead Console
Details
       

 03-15-2011
2.0
Routing Elevator Trim Cables
Details
       

 03-13-2011
3.0
Misc Empennage Parts
Details
       

 03-12-2011
2.0
Trim Bellcrank Assembly #2
Details
       

 03-12-2011
2.0
Trim Bellcrank Assembly #1
Details
       

 03-12-2011
1.0
Elevators
Details
     

 03-10-2011
1.0
Vertical Stabilizer
Details
       

 03-10-2011
2.0
Elevator Push Rod
Details
       

 03-08-2011
2.0
Trimming aft edge of top cowl
Details
       

 03-08-2011
2.0
Forward Cowl Trimming
Details
       

 03-05-2011
1.5
Horizontal Stabilizer
Details
     

 03-05-2011
0.5
Cowl Trimming
Details
     

 03-05-2011
1.5
Bolting the horiztontal to the empennage
Details
       

 03-03-2011
2.0
Horizontal Stabilizer and Cowl
Details
       

 03-01-2011
1.0
Rudder Cable Fairings
Details
       

 03-01-2011
1.3
Hang the Propeller
Details
       

 02-27-2011
3.0
Spinner Completion and Rudder Fairing
Details
       

 02-26-2011
3.0
Spinner Filler Plates
Details
       

 02-22-2011
2.0
Nav Antenna Doubler & Spinner Filler Plate
Details

 02-20-2011
3.0
Spinner, Cowl, and NAV Antenna Doubler
Details
       

 02-19-2011
0.0
Brad's ROTC Air Force Dining Out
Details
       

 02-18-2011
1.0
Spinner #5
Details
       

 02-16-2011
2.0
Spinner
Details
       

 02-15-2011
0.3
FM-200 Uninstall
Details
     

 02-12-2011
2.0
Spinner, Cowl, and Rudder Fairings
Details
       

 02-12-2011
2.0
Rod Bower Ram Air
Details
       

 02-06-2011
2.0
Alternator
Details
       

 02-05-2011
2.0
Hang engine, install governor and alternator
Details
       

 02-05-2011
1.0
Engine #2
Details
       

 02-05-2011
1.0
Backup Alternator
Details
       

 01-29-2011
2.0
Engine #1
Details
       

 01-27-2011
1.0
Firewall Forward and Engine
Details
       

 01-22-2011
2.0
Spinner Prep #3 and Fuelage on it's gear
Details
       

 01-16-2011
1.0
Spinner Prep #2
Details
     

 01-15-2011
1.0
Working on mounting tires
Details
       

 01-15-2011
1.0
Spinner Prep
Details
       

 01-12-2011
2.0
Nose and Main Wheels
Details
       

 01-08-2011
2.0
Nose Wheel
Details
       

 01-08-2011
1.0
Brake Mounts
Details
       

 01-06-2011
2.0
Priming Prop and Gear Parts
Details