KitLog pro

Powered By Kitlog Pro v2.0

Vans RV6
Work Logs Found: 111
Category Work Time: 233 Hours
 Date
Hours
Work Log Summary

Details

 12-23-2011
10.00
Fuselage Primed
       

 12-23-2011
10.00
Fuselage Painted
       

 12-23-2011
10.00
Fuselage Painted
       

 12-15-2011
10.00
Fuselage Paint Preparation
       

 11-01-2011
1.00
Cut Hole For Flap Actuator
     

 09-28-2011
4.00
Temporary Fit Of Wings
       

 07-01-2011
3.00
Final preparation forward deck after wiring.
     

 06-06-2011
1.00
Firewall modification for cable bulkhead fitting.
Details
     

 03-02-2011
2.00
Panel Cutout 2
       

 02-13-2011
2.00
Panel - Final Cut
Details
       

 01-12-2011
8.00
Forward Fuselage
       

 01-05-2011
6.00
Cabin Interiour Structure 2
       

 01-04-2011
6.00
Cabin Interiour Structure
       

 12-28-2010
3.00
Control Rods
Details
       

 12-17-2010
1.00
Drilled Seat Ribs
     

 12-14-2010
1.00
Rear Cabin Seat Belt Guides
       

 12-14-2010
1.00
Fitted Master Cylinders For Duel Brake
     

 12-13-2010
1.00
Temp Fitting Of Tail Wheel Springs
     

 12-13-2010
1.50
Rudder Stop
       

 12-12-2010
1.00
Rudder Pedal Fitting
       

 12-05-2010
1.50
Brake Pedal Fitting
       

 11-01-2010
4.00
Wing ALignment Continued
       

 11-01-2010
0.50
Rudder Cable Fitting
       

 11-01-2010
6.00
Fitted Wings For Alignment
       

 10-19-2010
1.00
Installed Rudder Cable
       

 10-18-2010
1.00
Some Fun In The Shop
Details
       

 10-18-2010
2.00
Rear Turtle Deck
       

 10-18-2010
1.00
Rear Top Skins Cleckoed
       

 10-18-2010
2.00
Rear Top Skins
       

 10-18-2010
1.00
Rear Canopy Skin Structure
       

 10-18-2010
0.50
Interiour ready for painting,
       

 10-18-2010
2.50
Installed Static Kit - Hose
       

 10-18-2010
1.00
Installed Static Kit
       

 10-18-2010
3.00
Installation Turtle Deck
       

 10-18-2010
1.00
Finish Bottom Skins
       

 10-18-2010
1.00
Empennage Stiffners
       

 10-13-2010
3.00
Empennage Attatch Section
       

 10-11-2010
1.00
Seat Rear Brace
     

 10-11-2010
2.00
Empennage Attach Area
       

 10-10-2010
2.00
Level Stand
Details
       

 10-10-2010
1.20
Installed Aft Cockpit Section
       

 10-10-2010
1.00
Fitted Control Assembly For Movement Test
     

 10-09-2010
2.00
Engine Stand
Details
       

 10-02-2010
0.50
General Tidy Up Of Rivets
       

 10-01-2010
1.00
Preparation Reat Turtle Deck
       

 10-01-2010
1.00
Further Tidy Up Fuse Rear End
       

 09-04-2010
0.50
MILESTONE. The fuse says goodbuy to the Jig.

 09-04-2010
0.50
Manufactured the elevator bel crank.
     

 09-02-2010
1.50
Seat Bottoms.
Details
       

 09-02-2010
2.50
Rear Baggage Cabbin Fitted
       

 09-02-2010
0.20
Look from right side up.
Details
       

 09-02-2010
1.50
External Air
Details

 09-02-2010
3.00
Bottom Skins Rivetred On.
Details

 09-02-2010
3.00
656 Gussets bent, primed & fitted.
       

 08-30-2010
2.00
Engine Stand
Details
       

 08-17-2010
1.00
Riveting On Right Side Skin
       

 08-08-2010
1.50
RHS Side Skin Finishing
Details
       

 08-07-2010
3.00
RHS Side Skin Preparation
       

 07-31-2010
0.50
Bolted In Seat Belt Brackets
     

 07-30-2010
1.00
Assembled Seat Parts
       

 07-09-2010
0.50
Filed Groove Out For Bottom Hinge
     

 07-03-2010
0.50
Side Skin Preparation
     

 06-26-2010
1.00
Bottom Skin Prepared
       

 06-26-2010
1.00
Bottom Skin Fitted
       

 06-26-2010
0.50
Bolts Fitted To Forward Fuse
     

 06-24-2010
1.00
Seat Backs Started
       

 06-24-2010
2.00
Seat Back Stiffners
       

 06-24-2010
3.00
Floor Skin Assembly
       

 06-24-2010
0.50
Fiited Floor Skin For Alignment
       

 06-23-2010
1.00
Floor Skin
       

 06-22-2010
4.00
Floor Skin Stiffners
       

 05-30-2010
1.50
Brake & Rudder Pedal Assembly
       

 05-25-2010
1.00
Rudder Pedal Assembly
       

 05-24-2010
2.00
Brake Pedal Assembly
       

 05-05-2010
1.50
Rear Inspection Holes
       

 05-01-2010
3.00
Family Affair
Details
       

 05-01-2010
2.00
Assembled Forward Fuselage
       

 04-30-2010
3.00
Rear Tail Cone Preparation
       

 04-30-2010
3.00
Rear Skinning
       

 04-30-2010
1.00
Cleaned & Primed Forward Fuselage Parts
     

 04-30-2010
2.00
Bottom Rear Skin Preparation
       

 04-26-2010
3.00
Manufactured forward fuselage braces & gussets
       

 04-26-2010
1.00
Drilled holes for control stick mounts & put in pl
       

 04-10-2010
2.00
Fusellage Assembly
       

 04-09-2010
0.50
Tailwheel Assembly Attatched.
     

 04-08-2010
3.00
Seat & Floor Rib Assembly
       

 04-08-2010
2.00
Initial Assembly & Alignment - Bulkheads
     

 04-08-2010
1.00
Baggage Compartment Cont.
     

 04-08-2010
1.00
Adjustments - Middle Floor Ribs
       

 04-07-2010
0.50
Longerons riveted to firewall.
     

 04-07-2010
1.00
Further Work F605
       

 04-07-2010
2.00
Floor Ribs
       

 04-07-2010
1.00
F604 Bulkhead Assembly
       

 04-07-2010
1.00
F-605 Bulkhead Primed & Assembled
     

 04-06-2010
4.00
Tail Section Bulkheads Primed & Put Together
       

 04-05-2010
3.00
Longerons Bent To Shape
     

 04-05-2010
0.50
Fuselage Jig Leveled
     

 04-03-2010
3.00
Stringers Attached
       

 04-02-2010
0.50
Other Bulkkheads More
       

 04-02-2010
0.50
Other Bulkkheads More
       

 04-02-2010
4.00
Other Bulkheads
       

 04-01-2010
4.00
F605 Bulkhead
       

 03-22-2010
3.00
F606, 607 & 608
Details
       

 03-08-2010
2.00
Firewall Clecoed & Riveted Together
       

 03-08-2010
0.50
Firewall Assembled
     

 03-08-2010
1.00
Firewall Aluminium Parts Primed.
       

 03-07-2010
1.00
Firewall Various Parts Formed
Details
       

 03-07-2010
1.00
Firewall Stiffners Put In Place
       

 03-06-2010
0.60
Fuselage Jig Assembled
Details
     

 03-01-2010
1.50
Firewall Pats Put Together
       

 02-28-2010
0.50
Fuselage Started - Plans Open
     










Copyright © 2001-2024 Matronics. All Rights Reserved.