KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
Work Logs Found: 13
Category Work Time: 58 Hours
 Date
Hours
Work Log Summary

Details

 05-19-2018
20.00
Intake with Alternate air door
Details
       

 01-18-2018
4.00
Engine baffle
Details
       

 10-16-2017
2.00
ASA Air Oil Separator
Details
       

 10-15-2017
0.50
Oil cooler lines
Details

 07-28-2017
3.00
Propeller Govenor Oil Line
Details
       

 04-12-2017
5.00
Mixture control Re-Do
Details
       

 01-19-2017
4.00
Fuel Flow Sensor Bracket
Details
     

 01-11-2017
3.00
Throttle cable bracket
Details
       

 12-25-2016
9.00
Mixture control bracket
Details
       

 12-15-2016
3.50
Installed EGT and CHT sensors
Details
       

 11-30-2016
2.50
Exhaust System
Details
       

 04-26-2016
0.10
Engine data
Details
     

 04-20-2016
1.00
Picked up the engine
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.