Date
|
Hours
|
Work Log Summary
|
Details
|
07-29-2023
|
2.50
|
Touchup on Horizontal Stab., & Vert. Stab, Rudder
|
Details
|
|
|
07-22-2023
|
5.50
|
Painting & Touchup on Elevator, Horizontal Stab.,
|
Details
|
|
|
07-19-2023
|
4.50
|
Painting the Elevator, Horizontal Stab....
|
Details
|
|
|
07-16-2023
|
7.75
|
Primiming & Prep the Elevator, Horizontal Stab....
|
Details
|
|
|
03-26-2023
|
4.00
|
|
|
|
|
03-25-2023
|
8.50
|
|
|
|
|
03-19-2023
|
5.50
|
|
|
|
|
03-11-2023
|
6.00
|
|
|
|
|
03-07-2023
|
2.00
|
|
|
|
|
03-05-2023
|
4.00
|
|
|
|
|
03-04-2023
|
8.00
|
|
|
|
|
03-03-2023
|
3.50
|
|
|
|
|
02-26-2023
|
7.00
|
|
|
|
|
02-25-2023
|
3.00
|
|
|
|
|
01-29-2023
|
6.00
|
|
|
|
|
01-28-2023
|
4.00
|
|
|
|
|
01-21-2023
|
5.00
|
|
|
|
|
01-08-2023
|
6.00
|
|
|
|
|
01-07-2023
|
2.00
|
|
|
|
|
12-23-2022
|
3.00
|
|
|
|
|
12-20-2022
|
5.00
|
|
|
|
|
12-18-2022
|
7.00
|
|
|
|
|
12-17-2022
|
7.50
|
Fit and Install Panels Aft of Fuselage to Dash
|
Details
|
|
|
12-04-2022
|
1.50
|
Install Tee to Run Pitot/Static/AOA Lines to Prima
|
Details
|
|
|
12-04-2022
|
5.00
|
Install Sound Proofing in Cabin
|
Details
|
|
|
11-12-2022
|
8.00
|
Install Coolant & Oil Hoses, Heatshielding on Hose
|
Details
|
|
|
11-11-2022
|
2.00
|
Build shelf and Install Secondary ADAHRS
|
Details
|
|
|
10-28-2022
|
2.00
|
Measure Spinner, Order Prop
|
Details
|
|
|
10-15-2022
|
6.00
|
Muffler and Cabin Heat
|
Details
|
|
|
10-12-2022
|
5.00
|
Wired Back of Panel
|
Details
|
|
|
10-11-2022
|
6.00
|
Cover Dash Panel, Install Dynon Modules, Switches
|
Details
|
|
|
10-09-2022
|
10.00
|
Build Dash Shelf and Install Dynon Components-Pilo
|
Details
|
|
|
10-08-2022
|
12.00
|
Wire Engine Sensors to Dash
|
Details
|
|
|
10-07-2022
|
9.00
|
Run Fuel Lines, Install Fireproof Cover
|
Details
|
|
|
10-06-2022
|
8.25
|
Carburator Air Filter Assembly, Cables
|
Details
|
|
|
10-02-2022
|
7.00
|
Rewire Tail Nav/Strobe & Pitch Trim
|
Details
|
|
|
10-01-2022
|
9.00
|
Identify and Install Exhaust
|
Details
|
|
|
09-30-2022
|
2.00
|
Prep Flange, Test Fit Prop Extension
|
Details
|
|
|
09-25-2022
|
5.00
|
Cabin Interior
|
Details
|
|
|
09-24-2022
|
5.00
|
Covered Brake & Throttle Contols w/Carbon Fiber
|
Details
|
|
|
09-18-2022
|
2.50
|
Remove Control Sticks, Test & Reinstall
|
Details
|
|
|
09-17-2022
|
4.50
|
Build Serial Cables-Dynon
|
Details
|
|
|
09-14-2022
|
2.00
|
Upholstery on Seats
|
Details
|
|
|
09-12-2022
|
3.00
|
Paint Interior
|
Details
|
|
|
09-11-2022
|
1.50
|
Mounted Transmotec Trim Actuator
|
Details
|
|
|
09-11-2022
|
1.50
|
Install Rear Cabin Bulkhead
|
Details
|
|
|
09-10-2022
|
2.00
|
Torqued and Marked Fuselage Nuts and Bolts
|
Details
|
|
|
09-10-2022
|
1.50
|
Installed Dynon Pitch Servo
|
Details
|
|
|
09-09-2022
|
2.50
|
Prep Cabin Interior for Paint
|
Details
|
|
|
08-28-2022
|
4.00
|
Cleaning, Inspection & Inventory of Parts
|
Details
|
|
|
08-28-2022
|
1.75
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
2.50
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
2.00
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
4.00
|
Cleaning and Inspection
|
Details
|
|
|
08-22-2022
|
5.75
|
Unloading the Aircraft and Parts at our Residence
|
Details
|
|
|
08-21-2022
|
6.50
|
Packing and Loading Airplane Components and Parts
|
Details
|
|
|
08-20-2022
|
7.50
|
Inspection of Airframe, Disassembly for Moving
|
Details
|
|