Date
|
Hours
|
Work Log Summary

|
Details

|
08-12-2025
|
7.00
|
final riveting of turtle deck
|
Details
|
|
|
08-07-2025
|
7.00
|
finished the intial temporary installation of cove
|
Details
|
|
|
08-06-2025
|
6.00
|
continuing with instrument bay cover
|
Details
|
|
|
08-05-2025
|
9.00
|
added instrument bay cover
|
Details
|
|
|
08-02-2025
|
8.00
|
making progress slowly
|
Details
|
|
|
08-01-2025
|
8.00
|
right hand side of forward fuselage
|
Details
|
|
|
07-31-2025
|
10.00
|
more work on nut strips for forward fuselage, righ
|
Details
|
|
|
07-30-2025
|
8.00
|
still working on forward fuselage rivnut strips
|
Details
|
|
|
07-29-2025
|
6.00
|
several differnt tasks
|
Details
|
|
|
07-28-2025
|
3.00
|
cutting seat belt mount holes in bulkhead F7
|
Details
|
|
|
07-27-2025
|
8.00
|
made a riv-nut strip for one of the skin seams
|
Details
|
|
|
07-26-2025
|
8.00
|
switching out silver clecoes for copper clecoes
|
Details
|
|
|
07-25-2025
|
6.00
|
more experimentations with skins
|
Details
|
|
|
07-24-2025
|
8.00
|
forward fuselage skins
|
Details
|
|
|
07-21-2025
|
5.00
|
turtle deck
|
Details
|
|
|
07-20-2025
|
8.00
|
turtle deck
|
Details
|
|
|
07-19-2025
|
5.00
|
cut out remaining fuselage skin panels
|
Details
|
|
|
07-18-2025
|
2.00
|
cut out templates for remaining skins
|
Details
|
|
|
07-16-2025
|
3.00
|
refinements on the front cover over fuel tank
|
Details
|
|
|
07-15-2025
|
4.00
|
fit forward fuselage skin over fuel tank
|
Details
|
|
|
06-20-2025
|
2.00
|
cowl fitting
|
Details
|
  |
|
05-30-2020
|
9.00
|
front spar of vertical fin fitted to fuselage
|
Details
|
|
|
05-28-2020
|
7.00
|
side skins by tail wheel
|
Details
|
|
|
05-27-2020
|
8.00
|
side skins above tailwheel
|
Details
|
|
|
05-21-2020
|
8.00
|
drilled and clecoed new F10 bulkhead
|
Details
|
|
|
05-19-2020
|
4.00
|
debur left side fuse skin and trim to final size
|
Details
|
|
|
05-18-2020
|
5.00
|
fabricate tail spring pivot
|
Details
|
|
|
05-17-2020
|
7.00
|
made form block for F10 and formed F10
|
Details
|
|
|
05-16-2020
|
7.00
|
up drilled left side skin rivet holes plus new F10
|
Details
|
|
|
05-14-2020
|
6.00
|
trimming fuselage skin and longerons
|
Details
|
|
|
05-12-2020
|
6.00
|
work on fuselage skin and bulkheads
|
Details
|
|
|
05-11-2020
|
4.00
|
planning F 11 and F 12 installation
|
Details
|
|
|
03-13-2020
|
10.00
|
finish fitting aft left side fuselage skins
|
Details
|
|
|
03-12-2020
|
10.00
|
left side aft skin on fuselage
|
Details
|
|
|
03-10-2020
|
10.00
|
right side aft fuselage skins
|
Details
|
|
|
03-09-2020
|
6.00
|
continue fuselage skin fitting
|
Details
|
|
|
03-08-2020
|
8.00
|
continuing to fit aft fuselage skins
|
Details
|
|
|
03-04-2020
|
10.00
|
deburred and rivetted top skin of aft fuselage
|
Details
|
|
|
03-01-2020
|
10.00
|
deburred and riveted bottom skin
|
Details
|
|
|
02-29-2020
|
10.00
|
rebuild bulkhead F 9
|
Details
|
|
|
02-23-2020
|
5.00
|
continuing fitting skin of aft fuselage
|
Details
|
|
|
02-12-2020
|
8.00
|
bottom skin forming
|
Details
|
|
|
02-11-2020
|
10.00
|
finished fitting top skin, cut out bottom skin
|
Details
|
|
|
02-10-2020
|
8.00
|
continue forming top skin to bulkheads
|
Details
|
|
|
02-09-2020
|
8.00
|
top skin of aft fuselage
|
Details
|
|
|
02-08-2020
|
8.00
|
set up aft bulkheads
|
Details
|
|
|
02-02-2020
|
8.00
|
forward fuselage to end of table, controls work
|
Details
|
|
|
01-29-2020
|
6.00
|
Drilled and rivetted F3 to vertical angle
|
Details
|
|
|
01-27-2020
|
8.00
|
torqued gusset bolts, installed F3 bulkhead
|
Details
|
|
|
01-25-2020
|
7.00
|
seat back rivetting, gusset bolting, machine screw
|
Details
|
|
|
01-17-2020
|
9.00
|
completed installation of F5 bulkheads
|
Details
|
|
|
01-16-2020
|
4.00
|
checking and fine-tuning alignment and levelling
|
Details
|
|
|
12-24-2019
|
8.00
|
bolt upper longerons to firewall, install angle at
|
Details
|
|
|
12-21-2019
|
6.00
|
attachment and bracing of forward longerons
|
Details
|
|
|
12-18-2019
|
6.00
|
fabricate upper forward longerons
|
Details
|
|
|
12-17-2019
|
9.00
|
lower longerons attached
|
Details
|
|
|
12-14-2019
|
8.00
|
stiffened firewall, fabricated lower longerons
|
Details
|
|
|
12-09-2019
|
4.00
|
welding on control stick
|
Details
|
|
|
12-08-2019
|
4.00
|
beginning bulkhead setup
|
Details
|
|
|
12-02-2019
|
4.00
|
cleared assembly table and set up tailcone jig
|
Details
|
|
|
11-30-2019
|
4.00
|
formed firewall, pulled wings off
|
Details
|
|
|
11-29-2019
|
4.00
|
Bulkheads F3 and F4
|
Details
|
|
|
11-27-2019
|
5.00
|
Final rivet F9, form F11 and F12
|
Details
|
|
|
11-25-2019
|
6.00
|
forming and assembly of bulkhead F9
|
Details
|
|
|
11-22-2019
|
8.00
|
cut out aluminum blanks for bulkhead components
|
Details
|
|
|
11-21-2019
|
6.00
|
fabricate bulkhead F10
|
Details
|
|
|
11-18-2019
|
8.00
|
Fuselage bulkheads f2 and f8
|
Details
|
|
|
11-10-2019
|
6.00
|
bulkhead F2 and control stick
|
Details
|
|
|
11-08-2019
|
8.00
|
forming and fabricating bulkhead F6
|
Details
|
|
|
11-06-2019
|
6.00
|
formed forward floor supports and cut out aluminum
|
Details
|
|
|
11-03-2019
|
8.00
|
final test of fitting wings to center section befo
|
Details
|
|
|
09-11-2019
|
5.00
|
bottom skin of center section riveted on
|
Details
|
|
|
09-09-2019
|
6.00
|
center section bottom skin
|
Details
|
|
|
09-08-2019
|
6.00
|
seat pan finally riveted
|
Details
|
|
|
09-07-2019
|
6.00
|
substructure under seat pan
|
Details
|
|
|
09-06-2019
|
7.00
|
continued test fitting and refinement of seat ribs
|
Details
|
|
|
08-13-2019
|
4.00
|
cut out the firewall
|
Details
|
|
|
04-16-2011
|
4.00
|
cutting out aluminum for fuselage and fin
|
Details
|
  |