Date
|
Hours
|
Work Log Summary

|
Details

|
06-24-2007
|
0.75
|
Ran fuel flow test again 20.2 GPH
|
Details
|
  |
|
02-11-2006
|
1.00
|
Bagan installing alternator and filled coolant
|
Details
|
  |
|
01-09-2006
|
3.00
|
started making oil cooler bracket
|
Details
|
  |
|
01-07-2006
|
3.50
|
began installing oil res and oil cooler
|
Details
|
  |
|
01-05-2006
|
3.00
|
installed coolant hoses and misc stuff
|
Details
|
  |
|
01-04-2006
|
1.00
|
worked on engine
|
Details
|
  |
|
01-01-2006
|
4.00
|
installed fuel lines and water/fuel seperator
|
Details
|
  |
|
11-27-2005
|
3.00
|
Began connecting engine components
|
Details
|
  |
|
11-26-2005
|
1.50
|
Mounted engine on airframe
|
Details
|
  |
|
11-23-2005
|
3.00
|
Uncrated engine and other stuff
|
Details
|
  |
|
10-14-2001
|
2.00
|
drilled holes and dry fitted firewall
|
Details
|
  |