| Date 
 | Hours 
 | Work Log Summary 
  
 | Details 
  
 | 
		
	| 06-01-2015 
 | 0.50 
 | reclock wing supply fittings; add 2 FtoF 90 degree 
 |  | 
	|       | 
	| 
 | 
	
	| 08-25-2014 
 | 1.00 
 | prep and superfill wing tips 
 |  | 
	|     | 
	| 
 | 
	
	| 08-18-2014 
 | 2.50 
 | prep & superfill HS, ailerons &  flaps 
 |  | 
	|       | 
	| 
 | 
	
	| 11-25-2013 
 | 1.75 
 | fuel return - drill & c/s flange, prep and Hysol i 
 |  | 
	|       | 
	| 
 | 
	
	| 09-30-2013 
 | 1.00 
 | sand wings, stow in cradles for now 
 |  | 
	|       | 
	| 
 | 
	
	| 09-30-2013 
 | 2.00 
 | sand ailerons & flaps; continue sanding IS fuselag 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-30-2013 
 | 1.00 
 | prep ailerons and flaps for micro 
 |  | 
	|       | 
	| 
 | 
	
	| 09-30-2013 
 | 1.00 
 | micro ailerons and flaps 
 |  | 
	|       | 
	| 
 | 
	
	| 09-23-2013 
 | 2.00 
 | sand & prep wings and HS for superfill 
 |  | 
	|      | 
	| 
 | 
	
	| 09-02-2013 
 | 0.50 
 | super fill wing joggle and lower wing fairings #2 
 |  | 
	|       | 
	| 
 | 
	
	| 09-02-2013 
 | 0.50 
 | sand bottom of wing surfaces, super-fill fairings 
 |  | 
	|       | 
	| 
 | 
	
	| 09-01-2013 
 | 0.75 
 | SF lower wing and HW fairings 
 |  | 
	|       | 
	| 
 | 
	
	| 09-01-2013 
 | 0.75 
 | sand SF on top of wing fairings; flip over 
 |  | 
	|      | 
	| 
 | 
	
	| 09-01-2013 
 | 1.00 
 | prep lower wing fairings and misc spots 
 |  | 
	|      | 
	| 
 | 
	
	| 08-26-2013 
 | 1.00 
 | prep and S/F to top of both wing fairings 
 |  | 
	|       | 
	| 
 | 
	
	| 07-22-2013 
 | 1.50 
 | test & flox in R fuel probe 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-01-2013 
 | 3.50 
 | fuel probes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-01-2013 
 | 1.00 
 | flox in L fuel probe 
 |  | 
	|       | 
	| 
 | 
	
	| 07-01-2013 
 | 6.50 
 | finish flap hinges, stow wings and clean up 
 |  | 
	|       | 
	| 
 | 
	
	| 06-30-2013 
 | 0.00 
 | install flap brackets after jigging 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 06-30-2013 
 | 0.00 
 | flap bracket install 
 |  | 
	|       | 
	| 
 | 
	
	| 06-30-2013 
 | 0.00 
 | flap bracket cont'd 
 |  | 
	|       | 
	| 
 | 
	
	| 06-30-2013 
 | 1.50 
 | aileron brackets and flap travel 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-24-2013 
 | 2.25 
 | right aileron brackets 
 |  | 
	|       | 
	| 
 | 
	
	| 06-24-2013 
 | 2.00 
 | rig and fab aileron brackets 
 |  | 
	|       | 
	| 
 | 
	
	| 06-24-2013 
 | 1.25 
 | other misc. wing tasks 
 |  | 
	|       | 
	| 
 | 
	
	| 06-24-2013 
 | 1.25 
 | alieron brackets cont'd 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-13-2013 
 | 1.00 
 | grind aft R hardpoint; install both R side AOI pla 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 0.75 
 | set wings in spar box cont'd 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 1.50 
 | install L side AOI plates to hardpoints 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 1.00 
 | grind 2 5/8" pins for spar; grind R root; knock in 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 0.50 
 | check/adjust  AOI & sweep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 0.00 
 | check sweep of wings; AOI cont'd 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 0.00 
 | wing fit continued 
 |  | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 2.25 
 | spar box installation continued 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 2.25 
 | spar box install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 1.00 
 | rig fuselage for spar box/wing install 
 |  | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 1.50 
 | hang wings for angle/sweep fitting 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 1.00 
 | fab wing incidence jig & misc. shop 
 |  | 
	|       | 
	| 
 | 
	
	| 04-21-2013 
 | 0.75 
 | Super-fill #2 to top light pockets 
 |  | 
	|       | 
	| 
 | 
	
	| 04-21-2013 
 | 0.75 
 | sand light pockets in prep for s/f #2 
 |  | 
	|     | 
	| 
 | 
	
	| 04-01-2013 
 | 1.50 
 | take clecos out of tips and sand/cleanuo 
 |  | 
	|     | 
	| 
 | 
	
	| 03-26-2013 
 | 1.25 
 | under side wing light pockets; measure panel openi 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-26-2013 
 | 2.00 
 | sand, prep and super-fil light pockets & fuel caps 
 |  | 
	|       | 
	| 
 | 
	
	| 03-26-2013 
 | 2.50 
 | prep and flox close wing tips 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-26-2013 
 | 2.00 
 | install nav/strobe light brackets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-26-2013 
 | 0.00 
 | ground wire to nav light bracket 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-18-2013 
 | 1.50 
 | fit, drill, c/s, rivnut light lenses 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-11-2013 
 | 1.50 
 | trim light lenses to fit; drill, c/s; add rivnuts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-10-2013 
 | 3.00 
 | BID in light pockets 
 |  | 
	|       | 
	| 
 | 
	
	| 03-04-2013 
 | 1.25 
 | wing light conduit 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-03-2013 
 | 1.00 
 | mask, prep & superfill fuel cap openings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-18-2013 
 | 2.00 
 | add nutplates to light pockets; both L & R 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-17-2013 
 | 2.50 
 | L&R fuel fill cpas 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-17-2013 
 | 1.25 
 | cut in L side light pocket; trail & error for fit 
 |  | 
	|       | 
	| 
 | 
	
	| 02-17-2013 
 | 0.75 
 | cut in L & R light pockets for Aeroleds Aerosuns 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-28-2013 
 | 0.50 
 | mark fuel cap location - bad marks from factory 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-28-2013 
 | 1.00 
 | mark and cut opening for R wing light 
 |  | 
	|       | 
	| 
 | 
	
	| 01-28-2013 
 | 0.00 
 | manual page for fuel cap positioning 
 |  | 
	|      | 
	| 
 | 
	
	| 01-28-2013 
 | 0.75 
 | finish & fit lite pocket 
 |  | 
	|       | 
	| 
 | 
	
	| 01-27-2013 
 | 0.25 
 | finish fuel vents in wing ends 
 |  | 
	|      | 
	| 
 | 
	
	| 01-21-2013 
 | 4.50 
 | c/s and nutplates to wing tips 
 |  | 
	|       | 
	| 
 | 
	
	| 01-21-2013 
 | 1.50 
 | bond fuel vents to wing; install check valve 
 |  | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 1.00 
 | prep install of wing tips 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 1.00 
 | hang flaps; install 3 bronze bushings each side 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 1.25 
 | hang flaps; figure out which side of hinge to atta 
 |  | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 0.50 
 | add nutplates for wing access covers; c/s covers 
 |  | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 1.50 
 | Add 3 BID to top & bootom of wing tips - for nutpl 
 |  | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 1.50 
 | 
 |  | 
	|       | 
	| 
 | 
	
	| 12-24-2012 
 | 1.25 
 | start wing access covers 
 | Details 
 | 
	|       |