Powered By Kitlog Pro v2.0
Mark Weitkamp CX4
CX4
Landing Gear
Work Logs Found:
14
Category Work Time:
89 Hours
Date
Hours
Work Log Summary
Details
08-29-2025
7.00
final torquing of main axel mounting bolts
Details
08-28-2025
8.00
attempted to drill axel for cotter pin, failed
Details
08-26-2025
7.00
brake line bleeding and routing, caliper shimming
Details
08-25-2025
4.00
fine tuning the brakes hookup
Details
08-25-2025
1.00
document procedure for bleeding brakes
Details
08-24-2025
5.00
hooking up brake lines and loading fluid
Details
07-21-2025
3.00
Landing gear mounting bolts
Details
05-22-2020
7.00
clecoed F12 and test fit tail wheel
Details
03-18-2020
10.00
finishing and installing axels
Details
03-17-2020
8.00
fabricating axels
Details
03-16-2020
6.00
brake caliper fitting to mounting brackets
Details
03-15-2020
8.00
Assembled wheels, brake discs, tires & tubes
Details
03-14-2020
6.00
Wheels and axels
Details
02-22-2020
9.00
mounted main landing gear on fuselage
Details
SITE NAVIGATION
Contact Builder
CX4 Home
Category
# Logs
# Hours
All
578
2974
Control system
28
151
cylinder baffling, p
26
93
Empennage
44
216
Engine
41
223
engine cowl
17
84
engine cowling
104
441
fixtures and forms
17
84
Fuel System
4
19
Fuselage
78
521
Landing Gear
14
89
Miscellaneous
23
89
paperwork for regist
1
100
Time spent on projec
3
22
Windshield
5
29
Wings
173
813
Copyright © 2001-2025 Matronics. All Rights Reserved.