Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
14 Landing Gear
Work Logs Found:
20
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
06-12-2025
20.00
Nose Gear Fairings
Details
05-11-2025
30.00
Main Gear Fairings
Details
12-27-2024
4.00
Left Wheel Fairing
Details
12-22-2024
4.00
Main Gear Leg Fairings
Details
08-21-2024
3.00
Main Gear Leg Fairings
Details
02-25-2024
8.00
1: Brakes
Details
07-24-2023
6.00
Brake System Issues
Details
07-23-2023
3.00
2: Brake Fluid Filling
Details
12-11-2022
2.00
1: Brakes
Details
08-28-2022
2.50
2: Fitting the Main Wheels
Details
08-28-2022
2.00
1: Nose Wheel
Details
08-27-2022
2.00
2: Fitting the Nose Gear and Wheels
Details
08-27-2022
3.00
1: Lifting the Fuselage
Details
08-14-2022
2.00
2: Lifting the Fuselage
Details
02-15-2020
1.50
5: Nose Gear Shock Absorber
Details
11-30-2019
0.00
3: Landing Gear Pictures
Details
11-30-2019
4.00
2: Nose Wheel
Details
11-30-2019
1.50
1: Right Main Wheel
Details
11-18-2019
1.50
Main Wheels
Details
11-17-2019
4.50
2: Left Main Wheel
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
985
2314
01 Workshop
10
02 Tools
24
4
03 Empennage
145
324
04 Wings
84
236
05 Fuselage
140
392
06 Firewall
33
79
07 Engine/Propellor
134
359
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
35
88
11 Instrument Panel
69
184
12 Fuel System
28
67
13 Canopy
75
186
14 Landing Gear
20
104
15 Cockpit Interior
21
50
17 Painting
1
3
28 CofA
7
19
29 Regulatory
4
17
49 Miscellaneous
37
14
50 YMTG Hangar
51
Copyright © 2001-2025 Matronics. All Rights Reserved.