| Date 
 | Hours 
 | Work Log Summary 
  
 | Details 
  
 | 
		
	| 07-29-2023 
 | 2.50 
 | Touchup on Horizontal Stab., & Vert. Stab, Rudder 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-22-2023 
 | 5.50 
 | Painting & Touchup on Elevator, Horizontal Stab., 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-19-2023 
 | 4.50 
 | Painting the Elevator, Horizontal Stab.... 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-16-2023 
 | 7.75 
 | Primiming & Prep the Elevator, Horizontal Stab.... 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-26-2023 
 | 4.00 
 | 
 |  | 
	|     | 
	| 
 | 
	
	| 03-25-2023 
 | 8.50 
 | 
 |  | 
	|     | 
	| 
 | 
	
	| 03-19-2023 
 | 5.50 
 | 
 |  | 
	|     | 
	| 
 | 
	
	| 03-11-2023 
 | 6.00 
 | 
 |  | 
	|     | 
	| 
 | 
	
	| 03-07-2023 
 | 2.00 
 | Review of SB 0020 - 08062022 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-05-2023 
 | 4.00 
 | Testing and adding more dash wiring. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-04-2023 
 | 3.00 
 | Testing dash connectors and making a few correctio 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-03-2023 
 | 3.50 
 | Repaired minor surface rust on nose gear. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-26-2023 
 | 7.00 
 | Painted main gear, reinstalled tire, repacked bear 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-25-2023 
 | 3.00 
 | Nose gear and shock absorber inspected. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-29-2023 
 | 6.00 
 | Prepping access plates, fairings, tail, airlerons, 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-28-2023 
 | 4.00 
 | Install lower radio antennae, ELT horn & remote Dy 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-21-2023 
 | 5.00 
 | Install ELT 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-08-2023 
 | 9.00 
 | Wiring the back of dash board. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-07-2023 
 | 2.00 
 | Testing and inspection of the servo for the elevat 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-23-2022 
 | 3.00 
 | Remove Wiring toTail & Replace w/ Aviation Wire. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-20-2022 
 | 5.00 
 | Test Fit Canopy Frames and Front Windshield 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-18-2022 
 | 7.00 
 | 
 |  | 
	|     | 
	| 
 | 
	
	| 12-17-2022 
 | 7.50 
 | Fit and Install Panels Aft of Firewall to Dash 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-04-2022 
 | 1.50 
 | Install Tee to Run Pitot/Static/AOA Lines to Prima 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-04-2022 
 | 5.00 
 | Install Sound Proofing in Cabin 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-12-2022 
 | 8.00 
 | Install Coolant & Oil Hoses, Heatshielding on Hose 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-11-2022 
 | 2.00 
 | Build shelf and Install Secondary ADAHRS 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 10-28-2022 
 | 2.00 
 | Measure Spinner, Order Prop 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 10-15-2022 
 | 6.00 
 | Muffler and Cabin Heat 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-12-2022 
 | 9.00 
 | Wired Back of Panel 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-11-2022 
 | 6.00 
 | Cover Dash Panel, Install Dynon Modules, Switches 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-09-2022 
 | 10.00 
 | Build Dash Shelf and Install Dynon Components-Pilo 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-08-2022 
 | 12.00 
 | Wire Engine Sensors to Dash 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-07-2022 
 | 9.00 
 | Run Fuel Lines, Install Fireproof Cover 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-06-2022 
 | 8.25 
 | Carburator Air Filter Assembly, Cables 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-02-2022 
 | 7.00 
 | Rewire Tail Nav/Strobe & Pitch Trim 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-01-2022 
 | 9.00 
 | Identify and Install Exhaust 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-30-2022 
 | 2.00 
 | Prep Flange, Test Fit Prop Extension 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-25-2022 
 | 5.00 
 | Cabin Interior 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-24-2022 
 | 5.00 
 | Covered Brake & Throttle Contols w/Carbon Fiber 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-18-2022 
 | 2.50 
 | Remove Control Sticks, Test & Reinstall 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-17-2022 
 | 4.50 
 | Build Serial Cables-Dynon 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-14-2022 
 | 3.50 
 | Upholstery on Seats 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-12-2022 
 | 3.00 
 | Paint Interior 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-11-2022 
 | 1.50 
 | Mounted Transmotec Trim Actuator 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-11-2022 
 | 1.50 
 | Install Rear Cabin Bulkhead 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-10-2022 
 | 2.00 
 | Torqued and Marked Fuselage Nuts and Bolts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-10-2022 
 | 1.50 
 | Installed Dynon Pitch Servo 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-09-2022 
 | 2.50 
 | Prep Cabin Interior for Paint 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-28-2022 
 | 4.00 
 | Cleaning, Inspection & Inventory of Parts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-28-2022 
 | 1.75 
 | Cleaning and Inspection 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-27-2022 
 | 2.50 
 | Cleaning and Inspection 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-27-2022 
 | 2.00 
 | Cleaning and Inspection 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-27-2022 
 | 4.00 
 | Cleaning and Inspection 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-22-2022 
 | 5.75 
 | Unloading the Aircraft and Parts at our Residence 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-21-2022 
 | 6.50 
 | Packing and Loading Airplane Components and Parts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-20-2022 
 | 7.50 
 | Inspection of Airframe, Disassembly for Moving 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-31-2019 
 | 705.00 
 | Work Completed by Doug Worley 
 | Details 
 | 
	|     |