KitLog pro

Powered By Kitlog Pro v2.0

Andrew's RV10
Work Logs Found: 236
Category Work Time: 1792 Hours
 Date
Hours
Work Log Summary

Details

 04-25-2017
3.00
Weight & Balance
Details
       

 04-23-2017
8.00
Final panel & avionics installation
Details
       

 04-19-2017
1.00
Transition Training
Details
     

 04-18-2017
1.00
Transition Training
Details
       

 04-13-2017
24.00
Panel Paint and engraving
Details
       

 04-07-2017
1.00
SB 16-03-28 compliance
Details
       

 04-07-2017
1.00
SB 16-03-28 Compliance
Details
       

 03-31-2017
3.00
Rear Seat interior
Details
     

 03-19-2017
5.00
Panel prep for paint
Details
       

 03-17-2017
6.00
Fuel Qty Calibration
Details
     

 03-14-2017
2.00
ELT Registration
Details
     

 03-10-2017
6.00
Avionics Calibration
Details
       

 03-10-2017
1.00
Avionics Calibration
Details
 

 03-07-2017
3.00
Magnetometer Calibration
     

 03-03-2017
5.00
First Engine Run
Details

 03-02-2017
3.00
Priming Oil Lines
Details
     

 02-24-2017
15.00
Fitting gear fairings to plane
Details
       

 02-17-2017
2.00
ADAHRS Calibration
Details
     

 02-15-2017
20.00
Avionics configuring
Details
       

 02-11-2017
10.00
Avionics smoke test
Details
       

 02-05-2017
3.00
FLYLEDs Final install
Details
       

 02-04-2017
4.00
Aileron Trim
Details
       

 01-28-2017
4.00
OAT Probe
Details
       

 01-24-2017
12.00
Wing Wire Runs
       

 01-21-2017
10.00
Final wing install
Details
       

 01-20-2017
2.00
Moving to the Airport
Details
       

 01-20-2017
1.00
Moving to the Airport
Details
     

 01-20-2017
8.00
Intitial wing fit
Details
       

 01-16-2017
4.00
Wing Root Fairing
Details
       

 01-14-2017
6.00
Control Stick wires
Details
       

 01-09-2017
1.00
NACA air vent
Details
     

 01-06-2017
8.00
Engine wire runs
Details
     

 01-02-2017
3.00
POS-12 wire connection
Details
       

 01-02-2017
4.00
ELT solder connector
Details
       

 01-01-2017
10.00
Wire runs
Details
       

 12-30-2016
8.00
Wire Runs
Details
       

 12-29-2016
6.00
Headset jacks
Details
       

 12-28-2016
1.00
Mouse
Details
     

 12-26-2016
3.00
Pitch Trim D-Sub
Details
       

 12-23-2016
3.00
FLYLEDS circuit board D-Sub
Details
       

 12-20-2016
10.00
Audio Wires
Details
       

 12-16-2016
8.00
More wire runs
Details
       

 12-11-2016
4.00
Passenger Door Lock
Details
       

 12-10-2016
8.00
Panel wire runs
Details
       

 12-10-2016
1.00
FAB top plate
Details
       

 12-07-2016
6.00
cowl baffle seal
Details
       

 12-04-2016
3.00
Cup holder and side pocket
Details
       

 12-04-2016
2.00
Bleeding Brakes
Details
       

 11-30-2016
5.00
Cowl cosmetics
Details
     

 11-27-2016
2.00
FAB baffle seal
       

 11-27-2016
3.00
Exhaust
Details
       

 11-26-2016
2.00
Cowl repair
Details
     

 11-26-2016
4.00
Cowl Air Inlet
Details
       

 11-23-2016
4.00
Exhaust
Details
       

 11-21-2016
6.00
Cowl air inlet
       

 11-20-2016
1.00
Cylinder fin crack
Details
     

 11-19-2016
15.00
FAB construction
Details
       

 11-07-2016
6.00
Prop Cable problem
Details
       

 11-05-2016
8.00
Shunts, starter, battery, alternator cables
Details
       

 10-30-2016
13.00
Baffle seals
Details
       

 10-28-2016
6.00
Cowl fit
Details
       

 10-25-2016
8.00
Windshield Fairing
Details
       

 10-24-2016
1.00
Windshield Fairing
Details
       

 10-24-2016
2.00
Control sticks
Details
     

 10-23-2016
10.00
Windshield fairing
Details
       

 10-22-2016
3.00
Windshield fairing
Details
       

 10-22-2016
10.00
Engine Baffle
       

 10-21-2016
4.00
Window prep for fiberglass
Details
       

 10-20-2016
3.00
Baffle work
Details
       

 10-15-2016
8.00
Baffle work
Details
       

 10-14-2016
4.00
Louvers
       

 10-14-2016
10.00
Engine Baffle
       

 10-11-2016
4.00
Cowl Fit
Details
       

 10-06-2016
2.00
Air inlet ramps
Details
     

 10-02-2016
6.00
windshield install
       

 10-02-2016
10.00
Window install
Details
     

 09-26-2016
10.00
Cowl Fit
Details
       

 09-25-2016
3.00
Cowl Fit
       

 09-24-2016
2.00
GPS and Dome light pass-thrus
Details
     

 09-22-2016
1.00
Panel structure install
Details
       

 09-21-2016
3.00
Misc. panel installations
Details
       

 09-21-2016
1.00
Firewall insulation
Details
       

 09-19-2016
1.00
N Number
Details
       

 09-17-2016
3.00
Rear window fit
Details
       

 09-15-2016
8.00
Aerosport Interior side panels
       

 09-12-2016
8.00
Initial nose gear fairing work
       

 09-04-2016
10.00
More interior paint
Details
       

 09-03-2016
10.00
More interior paint
       

 09-03-2016
6.00
Door Paint
Details
       

 08-26-2016
1.00
Panel wiring
Details
       

 08-26-2016
1.00
FAA Registration
Details
     

 08-19-2016
10.00
Spinner completion
Details
       

 08-18-2016
10.00
Spinner work
Details
       

 08-15-2016
4.00
Registration
Details
       

 08-14-2016
10.00
Magnetometor
Details
       

 08-13-2016
3.00
Pitch A/P servo install
Details
       

 08-07-2016
6.00
B&C Standby alternator
Details
       

 08-06-2016
4.00
Aerosport console fit
Details
       

 08-04-2016
10.00
Empennage Fairing
Details
       

 07-08-2016
4.00
Rudder fairing
       

 07-08-2016
10.00
Elevator / H.S. Fairings
       

 07-06-2016
3.00
Fitting FLYLEDs to wingtip
     

 06-28-2016
10.00
Tailcone Avionics Shelf
Details
       

 06-28-2016
1.00
Carpet
Details
     

 06-27-2016
4.00
Seats
Details
     

 06-25-2016
2.00
FLYLEDS testing
       

 06-24-2016
2.00
FLYLEDS kit cont'd
       

 06-24-2016
2.00
FLYLEDS kit (cont'd)
       

 06-24-2016
4.00
FLYLEDS kit
Details
       

 06-12-2016
10.00
Elevator rework cont'd
Details
       

 06-07-2016
15.00
Nav antenna
Details
       

 06-05-2016
20.00
Elevator counter balance rework
Details
       

 05-29-2016
30.00
Garmin modules
Details
       

 05-22-2016
20.00
V.S. Rebuild
Details
       

 05-20-2016
6.00
H.S. attach
Details
       

 05-18-2016
30.00
Completed new Horizontal Stab
Details
       

 05-10-2016
3.00
Avionics and panel Arrived
Details
       

 05-05-2016
15.00
New Horizontal Stab
Details
       

 05-01-2016
4.00
Hanging the prop
       

 04-24-2016
4.00
B&C 60 amp primary alternator
       

 04-08-2016
6.00
Hanging the engine
       

 04-03-2016
10.00
Spinner fit
Details
       

 04-02-2016
6.00
Cabin Top final install
Details
       

 04-01-2016
40.00
Cabin top interior
Details
       

 03-27-2016
10.00
Engine mount install
Details
       

 03-25-2016
8.00
Matco Wheel assy
Details
       

 03-25-2016
15.00
Interior Paint
Details
       

 03-15-2016
1.00
Hartzell Prop arrives
Details
       

 03-08-2016
10.00
Aerosport Overhead Console
Details
       

 03-05-2016
10.00
Aerosport Overhead Console
Details
       

 02-29-2016
10.00
McMaster Door Seal
Details
       

 02-28-2016
20.00
Door handle/ plane around 3rd latch
Details
       

 02-20-2016
8.00
Door Buildup
Details
       

 02-14-2016
2.00
Door Buildup
Details
       

 02-13-2016
10.00
Door Buildup
       

 02-12-2016
10.00
Door Buildup
Details
       

 02-12-2016
3.00
Door Buildup
Details
       

 02-06-2016
3.00
Door Buildup
Details
       

 02-05-2016
6.00
Finish Kit / FWF kit
Details
     

 01-31-2016
1.00
Engine Arrival
Details
       

 01-18-2016
8.00
Aerosport overhead
Details
       

 01-10-2016
20.00
Initial drilling cabin top
Details
       

 01-08-2016
20.00
Cabin top initial fit
Details
       

 01-05-2016
12.00
fitted control sticks
       

 12-20-2015
10.00
Fuel system
Details
       

 12-19-2015
5.00
Parking brake
Details
       

 12-18-2015
10.00
Brake system
       

 12-13-2015
8.00
back floorboards
       

 12-12-2015
2.00
Comm coax run
Details
       

 12-11-2015
10.00
Comm antennas
Details
       

 12-08-2015
15.00
Baggage floors
Details
       

 12-04-2015
8.00
Fuselage cradle
Details
       

 11-29-2015
10.00
Landing gear mounts
Details
       

 11-28-2015
5.00
Insulated fwd floorboards
Details
       

 11-15-2015
4.00
Riveting tailcone mate
Details
       

 11-14-2015
8.00
Mating/match drilling tailcone
Details
       

 11-09-2015
2.00
Riveted fwd seat pans
       

 11-07-2015
10.00
Fuselage skin riveting
Details
       

 11-06-2015
6.00
Engine mount gussets
Details
       

 10-10-2015
10.00
Longeron/Skin Drillout
       

 10-01-2015
10.00
FWD Side Skin Bending
       

 09-26-2015
10.00
Aft Side Skin Drillout
       

 09-18-2015
10.00
Bending Aft Side Skins
       

 09-13-2015
15.00
Bending Longerons cont'd
       

 09-07-2015
15.00
Bending Longerons
Details
       

 08-21-2015
10.00
Landing gear tower
Details
       

 08-20-2015
4.00
Landing gear tower
Details
       

 08-14-2015
6.00
Riveting FWD/Mid fuse
Details
       

 08-03-2015
6.00
FWD fuse / Mid fuse
Details
       

 07-14-2015
4.00
FWD fuselage Bottom Skins continued
Details
       

 07-13-2015
4.00
FWD fuselage Bottom Skins cont'd
       

 07-12-2015
4.00
FWD fuselage Bottom Skins
Details
       

 06-03-2015
3.00
Step Mount Bracket
Details
       

 06-03-2015
10.00
Riveting the Mid Fuselage
       

 05-31-2015
4.00
Airward Tunnel Access Cover
Details
       

 05-22-2015
10.00
Firewall buildup
Details
       

 05-08-2015
10.00
Baggage ribs and Belly Skin
       

 04-19-2015
10.00
Mid Fuse Bulkhead Assy
       

 03-24-2015
10.00
Priming parts
Details
       

 03-06-2015
10.00
Wing tips
Details
       

 01-30-2015
10.00
Center Section Bulkhead
Details
       

 08-01-2014
0.00
Factory Construction
Details
       

 03-22-2014
15.00
Rivet Wing Skins
Details
       

 03-22-2014
2.00
Completed Wing Skin pictures
       

 03-21-2014
2.00
Gretz Pitot Mast doubler / cut-out
Details
       

 03-21-2014
2.00
Gretz Pitot Mast doubler / cut-out
       

 03-14-2014
7.00
Aileron Push Tubes
Details
       

 02-17-2014
4.00
Deburr, Dimple and Prime Lower Wing Skinks
       

 02-07-2014
3.00
Final Drilling Lower Wing Skins
       

 01-10-2014
10.00
Installing Duckworks Leading Edge Kit
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-10-2014
1.00
Duckworks cont'd
Details
       

 01-07-2014
1.00
Duckworks LED Leading Edge Light Kit
Details
       

 12-23-2013
3.00
fuel sending unit and leak testing
Details
       

 11-26-2013
5.00
Flap and Aileron gap farings
       

 11-26-2013
2.00
Flap and Aileron gap fairings
       

 11-15-2013
4.00
Wiring Conduit
Details
     

 10-19-2013
5.00
Fuel Sending Units
Details
       

 09-27-2013
3.00
Drilling Elevator Control Horns
       

 09-26-2013
3.00
Attaching Right Elevator
       

 09-25-2013
3.00
Attaching left elevator
       

 09-01-2013
0.00
Commercial Certificate
Details
     

 07-03-2013
1.00
Seatbelt brackets installed
       

 07-02-2013
4.00
Riveting Tailcone
     

 07-01-2013
1.00
Static Port installation
Details
       

 07-01-2013
10.00
Riveting Tailcone
       

 07-01-2013
10.00
Riveting Tailcone
       

 07-01-2013
10.00
Riveting Tailcone
       

 07-01-2013
10.00
Riveting Tailcone
       

 06-30-2013
2.00
Riveting Tailcone
       

 05-01-2013
53.00
Deburr/Dimple/Prime all T/C parts/skins

 04-22-2013
1.00
Rivet Rudder Trailing Edge
Details

 04-08-2013
7.00
Aft Deck Initial Assy & Shoulder Harness Mount
       

 03-23-2013
13.50
Tailcone Initial Assy. Top Skins
       

 03-17-2013
8.00
Tailcone Initial Assy. Skins/Stringers
       

 03-16-2013
6.00
Rolling Elevator Leading Edge
       

 03-16-2013
2.00
Riveting Elevator Trailing Edge
     

 03-15-2013
5.00
Wing Cradle Construction
Details
       

 03-14-2013
1.00
Quickbuild wings arrived
Details
     

 03-08-2013
5.00
Sealing Ribs/Trailing edge Elevator & Trim Tabs
       

 03-06-2013
1.50
Making the F-1032 Longerons

 03-04-2013
3.00
Trailing Edge Proseal Jig

 03-03-2013
2.50
Priming trim tabs

 03-02-2013
2.50
Making the tailcone Stringers

 02-25-2013
19.50
Closing up Elevators
       

 02-23-2013
12.00
Tailcone Initial Assy: Bulkhead Components

 02-20-2013
11.50
Riveting Parts to the Elevator Skins
       

 02-19-2013
2.00
Riveting Fwd Spar, Doublers, Control horns
       

 02-10-2013
6.50
Riveting Elevator Tip Ribs
     

 02-06-2013
9.50
Elevator Trim Tabs
Details
       

 01-27-2013
23.50
Priming
     

 01-15-2013
27.00
Dimpling Elevator Parts
Details
       

 12-28-2012
15.00
Elevator Initial Assembly
Details
       

 12-18-2012
130.00
Previous Builder's Work
Details
       

 12-04-2012
5.00
Preparing
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.