KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site

Builder:
Pete Young
Location:
Waverly, MN - USA
Aircraft:
Pete Young - Bearhawk
Engine:
-
Prop:
-

Welcome to my Bearhawk building/logging Web site. Here I will cronicle my adventures scratch building a Bearhawk designed by Bob Barrows. Actually, most of it may be quite boring because I am using it for my building log and will have an entry for each time I work on it. My "goal" is to have it finished by the time my oldest son graduates from high school...AKA my 14 year building plan. I've got 10 years to go. I like to call it my Erbman timeline.


Recent Activity
First Photo
Date

Work Log Summary

02-03-2010
Drilled the right root skin.
02-02-2010
Finished drilling the left root skin.
02-01-2010
Started drilling the root skin.
01-24-2010
Formed root leading edges.
01-20-2010
Cut out root skins and tank panels.
01-19-2010
Installed lugs on the large inspection holes.
01-18-2010
Finished riveting the lugs onto the rings.
01-12-2010
More work on the rings.
01-11-2010
Began riveting lug nuts.
01-10-2010
Applied a light coat of zinc oxide to rings.











Copyright © 2001-2010 Matronics. All Rights Reserved.